YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Hierarchical Structuring of PPP Risks Using Interpretative Structural Modeling

    Source: Journal of Construction Engineering and Management:;2010:;Volume ( 136 ):;issue: 002
    Author:
    K. C. Iyer
    ,
    Mohammed Sagheer
    DOI: 10.1061/(ASCE)CO.1943-7862.0000127
    Publisher: American Society of Civil Engineers
    Abstract: Project risk management emphasizes the need to rank and prioritize risks in a project to focus the risk management efforts. This risk prioritization is of special significance in public-private partnership (PPP) projects, since project success depends upon the efficient allocation of risks to the party who can best manage it. Previous studies on risk identification and assessment of PPP project risks have only produced an unstructured list of such risks and prioritizing them on the basis of probability and impact. This paper suggests the use of interpretative structural modeling (ISM) to prepare a hierarchical structure as well as the interrelationships of these risks that would enable decision makers to take appropriate steps. MICMAC (
    • Download: (473.2Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Hierarchical Structuring of PPP Risks Using Interpretative Structural Modeling

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/58276
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorK. C. Iyer
    contributor authorMohammed Sagheer
    date accessioned2017-05-08T21:39:01Z
    date available2017-05-08T21:39:01Z
    date copyrightFebruary 2010
    date issued2010
    identifier other%28asce%29co%2E1943-7862%2E0000132.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/58276
    description abstractProject risk management emphasizes the need to rank and prioritize risks in a project to focus the risk management efforts. This risk prioritization is of special significance in public-private partnership (PPP) projects, since project success depends upon the efficient allocation of risks to the party who can best manage it. Previous studies on risk identification and assessment of PPP project risks have only produced an unstructured list of such risks and prioritizing them on the basis of probability and impact. This paper suggests the use of interpretative structural modeling (ISM) to prepare a hierarchical structure as well as the interrelationships of these risks that would enable decision makers to take appropriate steps. MICMAC (
    publisherAmerican Society of Civil Engineers
    titleHierarchical Structuring of PPP Risks Using Interpretative Structural Modeling
    typeJournal Paper
    journal volume136
    journal issue2
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0000127
    treeJournal of Construction Engineering and Management:;2010:;Volume ( 136 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian