YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Developing an ARIS-House-Based Method from Existing Information Systems to Project-Based Enterprise Resource Planning for General Contractor

    Source: Journal of Construction Engineering and Management:;2010:;Volume ( 136 ):;issue: 002
    Author:
    H. Ping Tserng
    ,
    Samuel Y. L. Yin
    ,
    Mirosław J. Skibniewski
    ,
    M. H. Lee
    DOI: 10.1061/(ASCE)CO.1943-7862.0000125
    Publisher: American Society of Civil Engineers
    Abstract: In recent years, general contractors in the construction industry have gradually begun to implement a system called enterprise resource planning (ERP). During the ERP implementation process, contractors performed required analyses on daily operation functions demanded by the enterprise. The analyses focused on function mapping to ensure that ERP satisfies all the requirements, including the functions of existing information systems, and meets future requirements. The process of function mapping in the construction industry typically involves a series of lengthy and time-consuming meetings, and face-to-face discussions; systematic analysis procedure was lacking. This research will propose a novel function mapping approach, the Architecture of Integrated Information Systems (ARIS)-house-based (AHB) method, to enhance the effectiveness of meetings and improve the efficiency of discussions. In addition, AHB method will use the structure of ARIS-house diagram to guide the function mapping process, streamline existing information systems, meet future requirements, and successfully implement ERP. Finally, this research will use a case study to verify the effectiveness of the AHB method for contractor to implement ERP.
    • Download: (112.3Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Developing an ARIS-House-Based Method from Existing Information Systems to Project-Based Enterprise Resource Planning for General Contractor

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/58273
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorH. Ping Tserng
    contributor authorSamuel Y. L. Yin
    contributor authorMirosław J. Skibniewski
    contributor authorM. H. Lee
    date accessioned2017-05-08T21:39:01Z
    date available2017-05-08T21:39:01Z
    date copyrightFebruary 2010
    date issued2010
    identifier other%28asce%29co%2E1943-7862%2E0000130.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/58273
    description abstractIn recent years, general contractors in the construction industry have gradually begun to implement a system called enterprise resource planning (ERP). During the ERP implementation process, contractors performed required analyses on daily operation functions demanded by the enterprise. The analyses focused on function mapping to ensure that ERP satisfies all the requirements, including the functions of existing information systems, and meets future requirements. The process of function mapping in the construction industry typically involves a series of lengthy and time-consuming meetings, and face-to-face discussions; systematic analysis procedure was lacking. This research will propose a novel function mapping approach, the Architecture of Integrated Information Systems (ARIS)-house-based (AHB) method, to enhance the effectiveness of meetings and improve the efficiency of discussions. In addition, AHB method will use the structure of ARIS-house diagram to guide the function mapping process, streamline existing information systems, meet future requirements, and successfully implement ERP. Finally, this research will use a case study to verify the effectiveness of the AHB method for contractor to implement ERP.
    publisherAmerican Society of Civil Engineers
    titleDeveloping an ARIS-House-Based Method from Existing Information Systems to Project-Based Enterprise Resource Planning for General Contractor
    typeJournal Paper
    journal volume136
    journal issue2
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0000125
    treeJournal of Construction Engineering and Management:;2010:;Volume ( 136 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian