YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Consultants’ Perceptions on Construction Delay Analysis Methodologies

    Source: Journal of Construction Engineering and Management:;2009:;Volume ( 135 ):;issue: 012
    Author:
    Nuhu Braimah
    ,
    Issaka Ndekugri
    DOI: 10.1061/(ASCE)CO.1943-7862.0000096
    Publisher: American Society of Civil Engineers
    Abstract: Resolving the delay claims that usually trail delayed completion of construction projects is beset with immense difficulties that often lead to disputes between the parties involved. The research reported in this paper is a part of a wider study aimed at developing a framework for reducing the attendant disputes and aiding cost-efficient dispute resolution. The focus of the part reported here is owner consultants’ perceptions on existing methodologies for analyzing project delay. Based on a survey of U.K. construction consulting organizations, the study examined, among others, the awareness and use of these methodologies, their perceived reliability, expert involvement, and obstacles to their use. The main study findings are: (i) delay analysis is a multidisciplinary task, with the project quantity surveyor often playing the leading role on the owner’s side; (ii) the simpler methodologies are used more often than the complex ones although the former are known to be less reliable than the latter; and (iii) the principal obstacles to the use of the sophisticated methodologies are: lack of adequate project information, the use of programmes not in CPM network form, and poorly updated programmes. It is thus argued that improvement in current programming and record-keeping practices will promote the use of the more reliable methodologies which, in turn, will facilitate smoother resolution of delay claims.
    • Download: (830.0Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Consultants’ Perceptions on Construction Delay Analysis Methodologies

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/58243
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorNuhu Braimah
    contributor authorIssaka Ndekugri
    date accessioned2017-05-08T21:38:59Z
    date available2017-05-08T21:38:59Z
    date copyrightDecember 2009
    date issued2009
    identifier other%28asce%29co%2E1943-7862%2E0000102.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/58243
    description abstractResolving the delay claims that usually trail delayed completion of construction projects is beset with immense difficulties that often lead to disputes between the parties involved. The research reported in this paper is a part of a wider study aimed at developing a framework for reducing the attendant disputes and aiding cost-efficient dispute resolution. The focus of the part reported here is owner consultants’ perceptions on existing methodologies for analyzing project delay. Based on a survey of U.K. construction consulting organizations, the study examined, among others, the awareness and use of these methodologies, their perceived reliability, expert involvement, and obstacles to their use. The main study findings are: (i) delay analysis is a multidisciplinary task, with the project quantity surveyor often playing the leading role on the owner’s side; (ii) the simpler methodologies are used more often than the complex ones although the former are known to be less reliable than the latter; and (iii) the principal obstacles to the use of the sophisticated methodologies are: lack of adequate project information, the use of programmes not in CPM network form, and poorly updated programmes. It is thus argued that improvement in current programming and record-keeping practices will promote the use of the more reliable methodologies which, in turn, will facilitate smoother resolution of delay claims.
    publisherAmerican Society of Civil Engineers
    titleConsultants’ Perceptions on Construction Delay Analysis Methodologies
    typeJournal Paper
    journal volume135
    journal issue12
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0000096
    treeJournal of Construction Engineering and Management:;2009:;Volume ( 135 ):;issue: 012
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian