YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Contextual Information Requirements of Cost Estimators from Past Construction Projects

    Source: Journal of Construction Engineering and Management:;2009:;Volume ( 135 ):;issue: 009
    Author:
    Semiha Kiziltas
    ,
    Burcu Akinci
    DOI: 10.1061/(ASCE)CO.1943-7862.0000053
    Publisher: American Society of Civil Engineers
    Abstract: Past project data sources provide key information for construction cost estimators. Previous research studies show that relying only on one’s own experience during estimation results in estimators’ bias. Having and referring to historical databases, containing objective information on what happened in past projects, are essential for reducing estimators’ biases. The first step toward development of useful project history databases is to understand what information estimators require from past projects. The research described in this paper targets estimators’ information needs identified through interviews, brainstorming sessions, task analyses, and card games conducted with estimators with different experience levels and specialized in heavy/civil and commercial construction projects, and exploration of historical and standard databases available in companies to determine what is being currently represented. Findings show that estimators need contextual information, depicting the conditions under which specific production rates were achieved, so that they can identify which production rate would be more realistic to use during the production rate estimation of an activity in a new bid. Comparison of the contextual information needs identified in this research with information items available in historical data sources (such as company cost reports, RSMeans, previous studies) highlighted some gaps and important opportunities for improvements in those sources. The identified contextual information items are significant for practitioners in developing ways to augment their existing project history databases to make them more beneficial for estimators.
    • Download: (347.1Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Contextual Information Requirements of Cost Estimators from Past Construction Projects

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/58196
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorSemiha Kiziltas
    contributor authorBurcu Akinci
    date accessioned2017-05-08T21:38:55Z
    date available2017-05-08T21:38:55Z
    date copyrightSeptember 2009
    date issued2009
    identifier other%28asce%29co%2E1943-7862%2E0000059.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/58196
    description abstractPast project data sources provide key information for construction cost estimators. Previous research studies show that relying only on one’s own experience during estimation results in estimators’ bias. Having and referring to historical databases, containing objective information on what happened in past projects, are essential for reducing estimators’ biases. The first step toward development of useful project history databases is to understand what information estimators require from past projects. The research described in this paper targets estimators’ information needs identified through interviews, brainstorming sessions, task analyses, and card games conducted with estimators with different experience levels and specialized in heavy/civil and commercial construction projects, and exploration of historical and standard databases available in companies to determine what is being currently represented. Findings show that estimators need contextual information, depicting the conditions under which specific production rates were achieved, so that they can identify which production rate would be more realistic to use during the production rate estimation of an activity in a new bid. Comparison of the contextual information needs identified in this research with information items available in historical data sources (such as company cost reports, RSMeans, previous studies) highlighted some gaps and important opportunities for improvements in those sources. The identified contextual information items are significant for practitioners in developing ways to augment their existing project history databases to make them more beneficial for estimators.
    publisherAmerican Society of Civil Engineers
    titleContextual Information Requirements of Cost Estimators from Past Construction Projects
    typeJournal Paper
    journal volume135
    journal issue9
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0000053
    treeJournal of Construction Engineering and Management:;2009:;Volume ( 135 ):;issue: 009
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian