contributor author | Chih-tsang Lin | |
contributor author | Machine Hsie | |
contributor author | Wen-ta Hsiao | |
contributor author | Hsien-tang Wu | |
contributor author | Tao-ming Cheng | |
date accessioned | 2017-05-08T21:37:31Z | |
date available | 2017-05-08T21:37:31Z | |
date copyright | April 2012 | |
date issued | 2012 | |
identifier other | %28asce%29cf%2E1943-5509%2E0000222.pdf | |
identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/57810 | |
description abstract | Most construction projects involve earthmoving operations. Careful management of trucks to perform these operations is considered crucial by earthwork contractors in Taiwan. A mechanism is described that optimizes the management of the truck fleets of earthwork contractors. The proposed model integrates a discrete event simulation technique and genetic algorithms (GAs) to minimize the duration of earthmoving operations. The discrete simulation model is applied to simulate earthmoving operations and generate schedules for dispatching various trucks, and the GAs are used as a filter to screen out schedules that require long trips. Examples prove that the proposed model can determine near-optimal solutions efficiently. In addition, a user-friendly computer program is developed so that earthwork contractors can plan the dispatch schedule of earthmoving trucks easily and effectively. | |
publisher | American Society of Civil Engineers | |
title | Optimizing the Schedule of Dispatching Earthmoving Trucks through Genetic Algorithms and Simulation | |
type | Journal Paper | |
journal volume | 26 | |
journal issue | 2 | |
journal title | Journal of Performance of Constructed Facilities | |
identifier doi | 10.1061/(ASCE)CF.1943-5509.0000219 | |
tree | Journal of Performance of Constructed Facilities:;2012:;Volume ( 026 ):;issue: 002 | |
contenttype | Fulltext | |