YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Performance of Constructed Facilities
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Performance of Constructed Facilities
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Investigation of Corrosion Damage and Repair System in a Concrete Jetty Structure

    Source: Journal of Performance of Constructed Facilities:;2010:;Volume ( 024 ):;issue: 004
    Author:
    Farid Moradi-Marani
    ,
    Mohamad Shekarchi
    ,
    Ali Dousti
    ,
    Barzin Mobasher
    DOI: 10.1061/(ASCE)CF.1943-5509.0000112
    Publisher: American Society of Civil Engineers
    Abstract: This paper presents the diagnostic investigation of a reinforced concrete jetty after 15 years of service. The main cause of the deterioration was reinforcement corrosion, which initiated within few years after the completion of the jetty structure. The structure underwent major corrosion rehabilitation after 7 years of service. Despite the use of high-strength concrete in the construction of the jetty structure, inadequate cover thickness for reinforced concrete elements intensified corrosion rate and caused early age corrosion problems to reappear. Other contributing factors included high salinity of the seawater by simultaneous action of climatic factors such as exposure to high relative humidity and air temperature. After the initial repair work, a new investigative procedure was carried out to reevaluate the repaired and surrounding unrepaired areas. Results indicate that the deterioration progressed even in concrete elements that were undamaged during the first step of the investigation. No sign of steel corrosion appeared on repaired areas; but shrinkage cracking and incipient corrosion around repaired areas were indications of dimensional and electrochemical incompatibility between repair concrete and substrate. The repair strategy was reevaluated through the repair index method proposed by Andrade and Izquierdo. The results showed that the patching repair method was more suitable and feasible in comparison with other techniques.
    • Download: (1.395Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Investigation of Corrosion Damage and Repair System in a Concrete Jetty Structure

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/57703
    Collections
    • Journal of Performance of Constructed Facilities

    Show full item record

    contributor authorFarid Moradi-Marani
    contributor authorMohamad Shekarchi
    contributor authorAli Dousti
    contributor authorBarzin Mobasher
    date accessioned2017-05-08T21:37:18Z
    date available2017-05-08T21:37:18Z
    date copyrightAugust 2010
    date issued2010
    identifier other%28asce%29cf%2E1943-5509%2E0000115.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/57703
    description abstractThis paper presents the diagnostic investigation of a reinforced concrete jetty after 15 years of service. The main cause of the deterioration was reinforcement corrosion, which initiated within few years after the completion of the jetty structure. The structure underwent major corrosion rehabilitation after 7 years of service. Despite the use of high-strength concrete in the construction of the jetty structure, inadequate cover thickness for reinforced concrete elements intensified corrosion rate and caused early age corrosion problems to reappear. Other contributing factors included high salinity of the seawater by simultaneous action of climatic factors such as exposure to high relative humidity and air temperature. After the initial repair work, a new investigative procedure was carried out to reevaluate the repaired and surrounding unrepaired areas. Results indicate that the deterioration progressed even in concrete elements that were undamaged during the first step of the investigation. No sign of steel corrosion appeared on repaired areas; but shrinkage cracking and incipient corrosion around repaired areas were indications of dimensional and electrochemical incompatibility between repair concrete and substrate. The repair strategy was reevaluated through the repair index method proposed by Andrade and Izquierdo. The results showed that the patching repair method was more suitable and feasible in comparison with other techniques.
    publisherAmerican Society of Civil Engineers
    titleInvestigation of Corrosion Damage and Repair System in a Concrete Jetty Structure
    typeJournal Paper
    journal volume24
    journal issue4
    journal titleJournal of Performance of Constructed Facilities
    identifier doi10.1061/(ASCE)CF.1943-5509.0000112
    treeJournal of Performance of Constructed Facilities:;2010:;Volume ( 024 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian