Buried Pipeline Response to Braced Excavation MovementsSource: Journal of Performance of Constructed Facilities:;2010:;Volume ( 024 ):;issue: 003Author:Yue Choong Kog
DOI: 10.1061/(ASCE)CF.1943-5509.0000087Publisher: American Society of Civil Engineers
Abstract: This paper presents a detailed study to ascertain the response of a buried minor sewer pipeline consisting of three new manholes of 3.5- to 4-m deep and 89.7 m of 225-mm-diameter vitreous clay pipes to braced excavation ground movements. The pipeline and the manholes were supported on 6-m long, generally, of 65- to 75-mm-diameter Bakau (timber) piles embedded in 8- to 15-m-thick soft marine clay and peaty clay with an overconsolidation ratio of 1.2. The 34-m pipeline connecting two of the manholes ran parallel to a row of sheetpiles 9 m away. The sheetpiles formed one side of a strutted basement excavation about 9- to 10.5-m-deep. The excavation is part of an adjacent construction project. A recent oversite fill of 1.1 m has been placed to raise the site platform to avoid possible flooding throughout the area encompassing the pipeline and the adjacent construction project. Useful lessons which have been learnt from the study will be presented also.
|
Collections
Show full item record
contributor author | Yue Choong Kog | |
date accessioned | 2017-05-08T21:37:16Z | |
date available | 2017-05-08T21:37:16Z | |
date copyright | June 2010 | |
date issued | 2010 | |
identifier other | %28asce%29cf%2E1943-5509%2E0000090.pdf | |
identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/57677 | |
description abstract | This paper presents a detailed study to ascertain the response of a buried minor sewer pipeline consisting of three new manholes of 3.5- to 4-m deep and 89.7 m of 225-mm-diameter vitreous clay pipes to braced excavation ground movements. The pipeline and the manholes were supported on 6-m long, generally, of 65- to 75-mm-diameter Bakau (timber) piles embedded in 8- to 15-m-thick soft marine clay and peaty clay with an overconsolidation ratio of 1.2. The 34-m pipeline connecting two of the manholes ran parallel to a row of sheetpiles 9 m away. The sheetpiles formed one side of a strutted basement excavation about 9- to 10.5-m-deep. The excavation is part of an adjacent construction project. A recent oversite fill of 1.1 m has been placed to raise the site platform to avoid possible flooding throughout the area encompassing the pipeline and the adjacent construction project. Useful lessons which have been learnt from the study will be presented also. | |
publisher | American Society of Civil Engineers | |
title | Buried Pipeline Response to Braced Excavation Movements | |
type | Journal Paper | |
journal volume | 24 | |
journal issue | 3 | |
journal title | Journal of Performance of Constructed Facilities | |
identifier doi | 10.1061/(ASCE)CF.1943-5509.0000087 | |
tree | Journal of Performance of Constructed Facilities:;2010:;Volume ( 024 ):;issue: 003 | |
contenttype | Fulltext |