YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Performance of Constructed Facilities
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Performance of Constructed Facilities
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Comparative Analysis of Life-Cycle Costing for Rehabilitating Infrastructure Systems

    Source: Journal of Performance of Constructed Facilities:;2009:;Volume ( 023 ):;issue: 005
    Author:
    Mazen Farran
    ,
    Tarek Zayed
    DOI: 10.1061/(ASCE)CF.1943-5509.0000038
    Publisher: American Society of Civil Engineers
    Abstract: Metro systems usually offer an attractive alternative for mass transit transportation system in most large cities. Such infrastructures require proper maintenance and rehabilitation (M&R) programs to maintain them within an acceptable level of operational and safety performance. The Markov decision process (MDP) has been widely used to find the optimal M&R decision policy for situations that deal with uncertainties. A drawback of the traditional MDP approach is that it uses discrete number of states in the analysis as well as a stationary transition probability matrix (TPM). Also the MDP is based on the Markovian or “memory-less” property, which is not necessarily the fact for all aging infrastructures. This research presents a case study on a deteriorating slab in a Montreal metro. The traditional MDP is employed with linear programming to determine the optimal rehabilitation profile. Three different methods are employed for calculating life-cycle cost: (1) the average expected discount cost per time period that is normally used with the traditional MDP; (2) continuous rating approach; and (3) dynamic or time-dependent TPM. Results revealed that the continuous rating approach provides lower values compared to the traditional approach. Dynamic TPM reflects better the infrastructure behavior but necessitate additional data gathering. This research mainly benefits metro management agencies and enhances the MDP practice by overcoming some downsides of the traditional methodology.
    • Download: (497.3Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Comparative Analysis of Life-Cycle Costing for Rehabilitating Infrastructure Systems

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/57626
    Collections
    • Journal of Performance of Constructed Facilities

    Show full item record

    contributor authorMazen Farran
    contributor authorTarek Zayed
    date accessioned2017-05-08T21:37:12Z
    date available2017-05-08T21:37:12Z
    date copyrightOctober 2009
    date issued2009
    identifier other%28asce%29cf%2E1943-5509%2E0000041.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/57626
    description abstractMetro systems usually offer an attractive alternative for mass transit transportation system in most large cities. Such infrastructures require proper maintenance and rehabilitation (M&R) programs to maintain them within an acceptable level of operational and safety performance. The Markov decision process (MDP) has been widely used to find the optimal M&R decision policy for situations that deal with uncertainties. A drawback of the traditional MDP approach is that it uses discrete number of states in the analysis as well as a stationary transition probability matrix (TPM). Also the MDP is based on the Markovian or “memory-less” property, which is not necessarily the fact for all aging infrastructures. This research presents a case study on a deteriorating slab in a Montreal metro. The traditional MDP is employed with linear programming to determine the optimal rehabilitation profile. Three different methods are employed for calculating life-cycle cost: (1) the average expected discount cost per time period that is normally used with the traditional MDP; (2) continuous rating approach; and (3) dynamic or time-dependent TPM. Results revealed that the continuous rating approach provides lower values compared to the traditional approach. Dynamic TPM reflects better the infrastructure behavior but necessitate additional data gathering. This research mainly benefits metro management agencies and enhances the MDP practice by overcoming some downsides of the traditional methodology.
    publisherAmerican Society of Civil Engineers
    titleComparative Analysis of Life-Cycle Costing for Rehabilitating Infrastructure Systems
    typeJournal Paper
    journal volume23
    journal issue5
    journal titleJournal of Performance of Constructed Facilities
    identifier doi10.1061/(ASCE)CF.1943-5509.0000038
    treeJournal of Performance of Constructed Facilities:;2009:;Volume ( 023 ):;issue: 005
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian