YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Bridge Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Bridge Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Fatigue Evaluation of Longitudinal U-Bar Joint Details for Accelerated Bridge Construction

    Source: Journal of Bridge Engineering:;2012:;Volume ( 017 ):;issue: 002
    Author:
    Peng Zhu
    ,
    Zhongguo John Ma
    ,
    Catherine E. French
    DOI: 10.1061/(ASCE)BE.1943-5592.0000255
    Publisher: American Society of Civil Engineers
    Abstract: Continuous longitudinal U-bar joint details for accelerated bridge construction are investigated. Four pairs of full-scale slabs connected by a U-bar detail with one of the selected closure-pour materials were tested under static and fatigue loadings. The loading demand necessary in the slab fatigue testing is determined on the basis of 3D finite-element (FE) parametric studies. Test results were evaluated on the basis of flexural capacity, curvature behavior, cracking, and steel strain. The fatigue loading was found to have little influence on the U-bar joint behavior. In general, crack widths were small at the service load level. No debonding between the slab and the joint was noticed. The joint moment capacity can be calculated on the basis of the assumption that U-bars were continuous reinforcement through the joint zone (i.e., not staggered as in actual specimens) reaching their yield strengths at ultimate. The actual moment capacity depends on the interaction between the closure-pour material and steel as well as the steel arrangement. Because the closure-pour material is cast-in-place and has a relative short curing time for the purpose of accelerated construction, it is very important to control its strength variation. On the basis of these tests, the U-bar joint detail is a viable connection system for the longitudinal joint in bridge decks.
    • Download: (1.158Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Fatigue Evaluation of Longitudinal U-Bar Joint Details for Accelerated Bridge Construction

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/56795
    Collections
    • Journal of Bridge Engineering

    Show full item record

    contributor authorPeng Zhu
    contributor authorZhongguo John Ma
    contributor authorCatherine E. French
    date accessioned2017-05-08T21:35:11Z
    date available2017-05-08T21:35:11Z
    date copyrightMarch 2012
    date issued2012
    identifier other%28asce%29be%2E1943-5592%2E0000257.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/56795
    description abstractContinuous longitudinal U-bar joint details for accelerated bridge construction are investigated. Four pairs of full-scale slabs connected by a U-bar detail with one of the selected closure-pour materials were tested under static and fatigue loadings. The loading demand necessary in the slab fatigue testing is determined on the basis of 3D finite-element (FE) parametric studies. Test results were evaluated on the basis of flexural capacity, curvature behavior, cracking, and steel strain. The fatigue loading was found to have little influence on the U-bar joint behavior. In general, crack widths were small at the service load level. No debonding between the slab and the joint was noticed. The joint moment capacity can be calculated on the basis of the assumption that U-bars were continuous reinforcement through the joint zone (i.e., not staggered as in actual specimens) reaching their yield strengths at ultimate. The actual moment capacity depends on the interaction between the closure-pour material and steel as well as the steel arrangement. Because the closure-pour material is cast-in-place and has a relative short curing time for the purpose of accelerated construction, it is very important to control its strength variation. On the basis of these tests, the U-bar joint detail is a viable connection system for the longitudinal joint in bridge decks.
    publisherAmerican Society of Civil Engineers
    titleFatigue Evaluation of Longitudinal U-Bar Joint Details for Accelerated Bridge Construction
    typeJournal Paper
    journal volume17
    journal issue2
    journal titleJournal of Bridge Engineering
    identifier doi10.1061/(ASCE)BE.1943-5592.0000255
    treeJournal of Bridge Engineering:;2012:;Volume ( 017 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian