YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Bridge Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Bridge Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Retrofitting Short-Span Precast Channel Beam Bridges Constructed without Shear Reinforcement

    Source: Journal of Bridge Engineering:;2011:;Volume ( 016 ):;issue: 003
    Author:
    Ernest Heymsfield
    ,
    Stephan A. Durham
    DOI: 10.1061/(ASCE)BE.1943-5592.0000167
    Publisher: American Society of Civil Engineers
    Abstract: This paper investigates retrofitting precast, nonprestressed, channel beams (PCB) used in short-span bridges to improve beam shear strength and, consequently, beam ductility. Three retrofit approaches were investigated: applying carbon-fiber-reinforced polymer (CFRP) strips, applying an epoxy spray-on, and retrofitting by installing shear bars within the stems of the precast channel beam. Implanting shear bars into each precast channel beam stem was found to be the optimal retrofit based on improved beam strength, installation ease, and economics. The suitability of the shear bar retrofit was further explored by implementing the shear bar retrofit at a short-span precast channel beam bridge. Precast channel beam sections cast without shear reinforcement were used to construct Arkansas Bridge #02992 over the Flat Hollow Branch Creek. The bridge was constructed in 1955, but several of the beams used in the original construction have since been replaced with better-condition similar-style beams. The bridge is made up of four simple spans. Each span consists of 5.79-m (19-ft) precast channel beams cast without shear reinforcement. Five interior beams along with two exterior beams were placed side-by-side to develop the 7.62-m (25-ft) overall bridge cross section. Each interior beam has a width of 1.07 m (3 ft-6 in.), and each exterior beam has a width of 1.14 m (3 ft-9 in.). The exterior beams are slightly wider than the interior beams to incorporate the roadway curb within the cross section. During the implementation study, live-load distribution and dynamic-load amplification for a precast channel beam bridge were investigated.
    • Download: (1.532Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Retrofitting Short-Span Precast Channel Beam Bridges Constructed without Shear Reinforcement

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/56699
    Collections
    • Journal of Bridge Engineering

    Show full item record

    contributor authorErnest Heymsfield
    contributor authorStephan A. Durham
    date accessioned2017-05-08T21:34:58Z
    date available2017-05-08T21:34:58Z
    date copyrightMay 2011
    date issued2011
    identifier other%28asce%29be%2E1943-5592%2E0000169.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/56699
    description abstractThis paper investigates retrofitting precast, nonprestressed, channel beams (PCB) used in short-span bridges to improve beam shear strength and, consequently, beam ductility. Three retrofit approaches were investigated: applying carbon-fiber-reinforced polymer (CFRP) strips, applying an epoxy spray-on, and retrofitting by installing shear bars within the stems of the precast channel beam. Implanting shear bars into each precast channel beam stem was found to be the optimal retrofit based on improved beam strength, installation ease, and economics. The suitability of the shear bar retrofit was further explored by implementing the shear bar retrofit at a short-span precast channel beam bridge. Precast channel beam sections cast without shear reinforcement were used to construct Arkansas Bridge #02992 over the Flat Hollow Branch Creek. The bridge was constructed in 1955, but several of the beams used in the original construction have since been replaced with better-condition similar-style beams. The bridge is made up of four simple spans. Each span consists of 5.79-m (19-ft) precast channel beams cast without shear reinforcement. Five interior beams along with two exterior beams were placed side-by-side to develop the 7.62-m (25-ft) overall bridge cross section. Each interior beam has a width of 1.07 m (3 ft-6 in.), and each exterior beam has a width of 1.14 m (3 ft-9 in.). The exterior beams are slightly wider than the interior beams to incorporate the roadway curb within the cross section. During the implementation study, live-load distribution and dynamic-load amplification for a precast channel beam bridge were investigated.
    publisherAmerican Society of Civil Engineers
    titleRetrofitting Short-Span Precast Channel Beam Bridges Constructed without Shear Reinforcement
    typeJournal Paper
    journal volume16
    journal issue3
    journal titleJournal of Bridge Engineering
    identifier doi10.1061/(ASCE)BE.1943-5592.0000167
    treeJournal of Bridge Engineering:;2011:;Volume ( 016 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian