YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Bridge Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Bridge Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Verification of Incremental Launching Construction Safety for the Ilsun Bridge, the World’s Longest and Widest Prestressed Concrete Box Girder with Corrugated Steel Web Section

    Source: Journal of Bridge Engineering:;2011:;Volume ( 016 ):;issue: 003
    Author:
    KwangHoe Jung
    ,
    KwangSoo Kim
    ,
    ChungWook Sim
    ,
    JangHo Jay Kim
    DOI: 10.1061/(ASCE)BE.1943-5592.0000165
    Publisher: American Society of Civil Engineers
    Abstract: The Ilsun Bridge is the world’s longest (801 m in total length) and widest (30.9 m in maximum width) prestressed concrete box girder bridge incorporating a corrugated steel web. This bridge has fourteen spans, twelve of which were erected using an incremental launching method, a method that is rarely applied in this type of bridge. To verify the construction safety of the Ilsun Bridge, this investigation focuses on the span-to-depth ratio, buckling shear stress of the corrugated steel webs, optimization of the length of the steel launching nose, detailed construction stage analysis, and the stress level endured by the corrugated steel webs during the launching process. The span-to-depth ratio of the Ilsun Bridge was found to be well-designed, using a conservative corrugated steel web design. Further, our investigation revealed that the conventional nose-deck interaction equation was not suitable for corrugated steel web bridges. As a result, a detailed construction stage analysis and measurements of this bridge was performed to examine stress levels and ensure safety during the erection process. The results revealed that there are essential design issues that should be considered when designing prestressed concrete box girder bridges with corrugated steel webs and that, when constructing them, the incremental launching method should be used.
    • Download: (1.600Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Verification of Incremental Launching Construction Safety for the Ilsun Bridge, the World’s Longest and Widest Prestressed Concrete Box Girder with Corrugated Steel Web Section

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/56696
    Collections
    • Journal of Bridge Engineering

    Show full item record

    contributor authorKwangHoe Jung
    contributor authorKwangSoo Kim
    contributor authorChungWook Sim
    contributor authorJangHo Jay Kim
    date accessioned2017-05-08T21:34:58Z
    date available2017-05-08T21:34:58Z
    date copyrightMay 2011
    date issued2011
    identifier other%28asce%29be%2E1943-5592%2E0000167.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/56696
    description abstractThe Ilsun Bridge is the world’s longest (801 m in total length) and widest (30.9 m in maximum width) prestressed concrete box girder bridge incorporating a corrugated steel web. This bridge has fourteen spans, twelve of which were erected using an incremental launching method, a method that is rarely applied in this type of bridge. To verify the construction safety of the Ilsun Bridge, this investigation focuses on the span-to-depth ratio, buckling shear stress of the corrugated steel webs, optimization of the length of the steel launching nose, detailed construction stage analysis, and the stress level endured by the corrugated steel webs during the launching process. The span-to-depth ratio of the Ilsun Bridge was found to be well-designed, using a conservative corrugated steel web design. Further, our investigation revealed that the conventional nose-deck interaction equation was not suitable for corrugated steel web bridges. As a result, a detailed construction stage analysis and measurements of this bridge was performed to examine stress levels and ensure safety during the erection process. The results revealed that there are essential design issues that should be considered when designing prestressed concrete box girder bridges with corrugated steel webs and that, when constructing them, the incremental launching method should be used.
    publisherAmerican Society of Civil Engineers
    titleVerification of Incremental Launching Construction Safety for the Ilsun Bridge, the World’s Longest and Widest Prestressed Concrete Box Girder with Corrugated Steel Web Section
    typeJournal Paper
    journal volume16
    journal issue3
    journal titleJournal of Bridge Engineering
    identifier doi10.1061/(ASCE)BE.1943-5592.0000165
    treeJournal of Bridge Engineering:;2011:;Volume ( 016 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian