YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Using Risk Management Techniques to Control Contract Costs

    Source: Journal of Management in Engineering:;1987:;Volume ( 003 ):;issue: 004
    Author:
    Dennis A. Randolph
    ,
    Kunwar Rajendra
    ,
    James J. Campfield
    DOI: 10.1061/(ASCE)9742-597X(1987)3:4(314)
    Publisher: American Society of Civil Engineers
    Abstract: A method for evaluating the risk associated with a construction contract has been developed and applied to municipal contracts in Lansing, Michigan. Data on contract costs, change orders, and complexity were collected through an information system developed by the city. These data were analyzed and a number of “risk” nomographs developed based upon the analysis results. The nomographs allow construction management teams to determine the amount of effort that must be expended to monitor a particular project. The information system also allows managers to evaluate the activities of the construction managers and the city's construction program.
    • Download: (662.1Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Using Risk Management Techniques to Control Contract Costs

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/55665
    Collections
    • Journal of Management in Engineering

    Show full item record

    contributor authorDennis A. Randolph
    contributor authorKunwar Rajendra
    contributor authorJames J. Campfield
    date accessioned2017-05-08T21:32:50Z
    date available2017-05-08T21:32:50Z
    date copyrightOctober 1987
    date issued1987
    identifier other%28asce%299742-597x%281987%293%3A4%28314%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/55665
    description abstractA method for evaluating the risk associated with a construction contract has been developed and applied to municipal contracts in Lansing, Michigan. Data on contract costs, change orders, and complexity were collected through an information system developed by the city. These data were analyzed and a number of “risk” nomographs developed based upon the analysis results. The nomographs allow construction management teams to determine the amount of effort that must be expended to monitor a particular project. The information system also allows managers to evaluate the activities of the construction managers and the city's construction program.
    publisherAmerican Society of Civil Engineers
    titleUsing Risk Management Techniques to Control Contract Costs
    typeJournal Paper
    journal volume3
    journal issue4
    journal titleJournal of Management in Engineering
    identifier doi10.1061/(ASCE)9742-597X(1987)3:4(314)
    treeJournal of Management in Engineering:;1987:;Volume ( 003 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian