YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Arbitral Tribunal Proceedings Case Study: Egyptian Large-Scale Construction Project

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2009:;Volume ( 001 ):;issue: 003
    Author:
    Islam H. El-adaway
    ,
    A. Samer Ezeldin
    ,
    J. K. Yates
    DOI: 10.1061/(ASCE)1943-4162(2009)1:3(147)
    Publisher: American Society of Civil Engineers
    Abstract: This paper investigates how arbitration is used as a dispute resolution mechanism in Egyptian large scale construction projects and what are the types of issues that construction professionals should address when they encounter claims in the Egyptian construction market. To meet the goals and objectives of this study, a research project was conducted to study the arbitration process for a dispute that was in excess of $31 million, which arose out as a result of the proceeds of a large-scale project with an original contact price of $85 million that was constructed in Cairo, Egypt. This research project analytically investigated the background of the conflicts, the arbitral proceedings, and the award issued by the arbitral tribunal. Based on such thorough study, it was concluded that arbitration did not provide a timely and cost-effective resolution for the said dispute. Moreover, the same study has raised questions in relation to the overall management of megaconstruction projects in Egypt namely: (1) the impartiality of project managers; (2) the magnitude of change orders and consequent delays; (3) the magnitude of claimed amounts; and (4) the level of management and administration of claims and disputes. It is perceived that this paper would trigger professionals to think of other suitable dispute resolution mechanisms, such as dispute review boards, for settlement of claims arising from Egyptian large scale construction projects. Furthermore, this study would be of value for contractors and owners who intend to work in the Egyptian construction market.
    • Download: (90.12Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Arbitral Tribunal Proceedings Case Study: Egyptian Large-Scale Construction Project

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/55539
    Collections
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction

    Show full item record

    contributor authorIslam H. El-adaway
    contributor authorA. Samer Ezeldin
    contributor authorJ. K. Yates
    date accessioned2017-05-08T21:32:38Z
    date available2017-05-08T21:32:38Z
    date copyrightAugust 2009
    date issued2009
    identifier other%28asce%291943-4162%282009%291%3A3%28147%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/55539
    description abstractThis paper investigates how arbitration is used as a dispute resolution mechanism in Egyptian large scale construction projects and what are the types of issues that construction professionals should address when they encounter claims in the Egyptian construction market. To meet the goals and objectives of this study, a research project was conducted to study the arbitration process for a dispute that was in excess of $31 million, which arose out as a result of the proceeds of a large-scale project with an original contact price of $85 million that was constructed in Cairo, Egypt. This research project analytically investigated the background of the conflicts, the arbitral proceedings, and the award issued by the arbitral tribunal. Based on such thorough study, it was concluded that arbitration did not provide a timely and cost-effective resolution for the said dispute. Moreover, the same study has raised questions in relation to the overall management of megaconstruction projects in Egypt namely: (1) the impartiality of project managers; (2) the magnitude of change orders and consequent delays; (3) the magnitude of claimed amounts; and (4) the level of management and administration of claims and disputes. It is perceived that this paper would trigger professionals to think of other suitable dispute resolution mechanisms, such as dispute review boards, for settlement of claims arising from Egyptian large scale construction projects. Furthermore, this study would be of value for contractors and owners who intend to work in the Egyptian construction market.
    publisherAmerican Society of Civil Engineers
    titleArbitral Tribunal Proceedings Case Study: Egyptian Large-Scale Construction Project
    typeJournal Paper
    journal volume1
    journal issue3
    journal titleJournal of Legal Affairs and Dispute Resolution in Engineering and Construction
    identifier doi10.1061/(ASCE)1943-4162(2009)1:3(147)
    treeJournal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2009:;Volume ( 001 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian