YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Contractual Approach for Facilitating the Resolution of Dispute over a Contractor’s Failure to Comply with Time Limit for Notice of Delays

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2009:;Volume ( 001 ):;issue: 003
    Author:
    Ajibade Ayodeji Aibinu
    DOI: 10.1061/(ASCE)1943-4162(2009)1:3(137)
    Publisher: American Society of Civil Engineers
    Abstract: The enforcement of a contractor’s notice of delays and claims as “a condition precedent” to a contractor’s claims is a controversial issue among practitioners, researchers, and legal scholars. Strict enforcement or liberal interpretations (no enforcement) of time limit for a contractor’s notice have some implications for the success of projects and for the construction industry. This paper examines and compares the different views regarding enforceability of notice provisions. The paper evaluates those views and thereafter proposes an alternative contractual approach for dealing with a contractor’s noncompliance with the provision. The applicability of the proposed approach is evaluated vis-à-vis legal principles. The proposed approach appears to be practical and equitable. It could facilitate early resolution of disputes relating to notice. It could also make the outcome of notice-related dispute more predictable. Considering the contractual, legal, and practical problems that could arise from a strict enforcement and a liberal interpretation (no enforcement) of time limit for a contractor’s notice, the paper highlights the benefits of the proposed approach to the employers (project owners), contractors, and the construction industry at large.
    • Download: (111.7Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Contractual Approach for Facilitating the Resolution of Dispute over a Contractor’s Failure to Comply with Time Limit for Notice of Delays

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/55538
    Collections
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction

    Show full item record

    contributor authorAjibade Ayodeji Aibinu
    date accessioned2017-05-08T21:32:38Z
    date available2017-05-08T21:32:38Z
    date copyrightAugust 2009
    date issued2009
    identifier other%28asce%291943-4162%282009%291%3A3%28137%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/55538
    description abstractThe enforcement of a contractor’s notice of delays and claims as “a condition precedent” to a contractor’s claims is a controversial issue among practitioners, researchers, and legal scholars. Strict enforcement or liberal interpretations (no enforcement) of time limit for a contractor’s notice have some implications for the success of projects and for the construction industry. This paper examines and compares the different views regarding enforceability of notice provisions. The paper evaluates those views and thereafter proposes an alternative contractual approach for dealing with a contractor’s noncompliance with the provision. The applicability of the proposed approach is evaluated vis-à-vis legal principles. The proposed approach appears to be practical and equitable. It could facilitate early resolution of disputes relating to notice. It could also make the outcome of notice-related dispute more predictable. Considering the contractual, legal, and practical problems that could arise from a strict enforcement and a liberal interpretation (no enforcement) of time limit for a contractor’s notice, the paper highlights the benefits of the proposed approach to the employers (project owners), contractors, and the construction industry at large.
    publisherAmerican Society of Civil Engineers
    titleContractual Approach for Facilitating the Resolution of Dispute over a Contractor’s Failure to Comply with Time Limit for Notice of Delays
    typeJournal Paper
    journal volume1
    journal issue3
    journal titleJournal of Legal Affairs and Dispute Resolution in Engineering and Construction
    identifier doi10.1061/(ASCE)1943-4162(2009)1:3(137)
    treeJournal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2009:;Volume ( 001 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian