YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Avoiding and Mitigating Delay and Disruption Claims Conflict: Role of Precontract Negotiation

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2009:;Volume ( 001 ):;issue: 001
    Author:
    Ajibade Ayodeji Aibinu
    DOI: 10.1061/(ASCE)1943-4162(2009)1:1(47)
    Publisher: American Society of Civil Engineers
    Abstract: Delay and disruption claims often generate conflict and contract dispute in the delivery of building and civil engineering projects. If construction delay claims conflict can be avoided or mitigated, there could be substantial financial savings on projects. This study explores the effect of precontract negotiation as a means of avoiding or mitigating delay and disruption claims conflict. The data collection instrument was a structured questionnaire administered face to face on 41 contractors’ personnel on 41 completed projects in Singapore. The data were analyzed using structural modeling with partial least squares estimation approach. The results indicate that when the contractors received an unfavorable outcome from the contract administrator’s decision on their claims for delay, the intensity of conflict was lower when there was precontract negotiation and precontract agreement regarding the rules for quantifying and assessing the impact of anticipated delays than when there was none. It was also discovered that the higher the level of precontract negotiation and precontract agreement on the rules for quantifying and assessing delays, the higher the contractors perceived the quality of the decision-making process for delay claims during the construction phase. Further, the higher the contractors perceived the quality of the decision-making process for delay claims, the lower the intensity of conflict. At the time of entering into contracts, owners and their project management team need to pay more attention to precontract negotiation and agreement with their contractor to clarify and agree on the rules for quantifying and assessing the impact of anticipated delay and disruption. Aspects that require precontract negotiation, agreement, and clarification include: the rules of evidence for claims, the record requirements for claims and the procedure for keeping the records, form of construction program including the software for the preparation of the program and the procedure updating the program, the methodology for analyzing delay claims, formula for quantifying unabsorbed head office overhead component of prolongation cost, the method for quantifying disruption cost, the handling of concurrent delays, profit—whether claimable and the rate of profit to be paid, acceleration—circumstances under which it will be compensated and basis of compensation, and the question of who owns the float. These are, typically, not adequately covered by most standard forms of contracts. The agreements on these matters may be incorporated as part of partnering agreement or as a supplement to the contract agreement. Precontract negotiation, clarity, and agreements could produce instrumental and noninstrumental (social psychological) effects, which could facilitate delay and disruption claims assessment and their resolution. It could mitigate conflict even when the outcomes are unfavorable to a party.
    • Download: (202.8Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Avoiding and Mitigating Delay and Disruption Claims Conflict: Role of Precontract Negotiation

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/55525
    Collections
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction

    Show full item record

    contributor authorAjibade Ayodeji Aibinu
    date accessioned2017-05-08T21:32:37Z
    date available2017-05-08T21:32:37Z
    date copyrightFebruary 2009
    date issued2009
    identifier other%28asce%291943-4162%282009%291%3A1%2847%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/55525
    description abstractDelay and disruption claims often generate conflict and contract dispute in the delivery of building and civil engineering projects. If construction delay claims conflict can be avoided or mitigated, there could be substantial financial savings on projects. This study explores the effect of precontract negotiation as a means of avoiding or mitigating delay and disruption claims conflict. The data collection instrument was a structured questionnaire administered face to face on 41 contractors’ personnel on 41 completed projects in Singapore. The data were analyzed using structural modeling with partial least squares estimation approach. The results indicate that when the contractors received an unfavorable outcome from the contract administrator’s decision on their claims for delay, the intensity of conflict was lower when there was precontract negotiation and precontract agreement regarding the rules for quantifying and assessing the impact of anticipated delays than when there was none. It was also discovered that the higher the level of precontract negotiation and precontract agreement on the rules for quantifying and assessing delays, the higher the contractors perceived the quality of the decision-making process for delay claims during the construction phase. Further, the higher the contractors perceived the quality of the decision-making process for delay claims, the lower the intensity of conflict. At the time of entering into contracts, owners and their project management team need to pay more attention to precontract negotiation and agreement with their contractor to clarify and agree on the rules for quantifying and assessing the impact of anticipated delay and disruption. Aspects that require precontract negotiation, agreement, and clarification include: the rules of evidence for claims, the record requirements for claims and the procedure for keeping the records, form of construction program including the software for the preparation of the program and the procedure updating the program, the methodology for analyzing delay claims, formula for quantifying unabsorbed head office overhead component of prolongation cost, the method for quantifying disruption cost, the handling of concurrent delays, profit—whether claimable and the rate of profit to be paid, acceleration—circumstances under which it will be compensated and basis of compensation, and the question of who owns the float. These are, typically, not adequately covered by most standard forms of contracts. The agreements on these matters may be incorporated as part of partnering agreement or as a supplement to the contract agreement. Precontract negotiation, clarity, and agreements could produce instrumental and noninstrumental (social psychological) effects, which could facilitate delay and disruption claims assessment and their resolution. It could mitigate conflict even when the outcomes are unfavorable to a party.
    publisherAmerican Society of Civil Engineers
    titleAvoiding and Mitigating Delay and Disruption Claims Conflict: Role of Precontract Negotiation
    typeJournal Paper
    journal volume1
    journal issue1
    journal titleJournal of Legal Affairs and Dispute Resolution in Engineering and Construction
    identifier doi10.1061/(ASCE)1943-4162(2009)1:1(47)
    treeJournal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2009:;Volume ( 001 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian