YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Leadership and Management in Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Leadership and Management in Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Four-Dimensional Modeling to Support Construction Planning of the Stata Center Project

    Source: Leadership and Management in Engineering:;2003:;Volume ( 003 ):;issue: 002
    Author:
    Jessica Hastings
    ,
    John Kibiloski
    ,
    Martin Fischer
    ,
    John Haymaker
    ,
    Kathleen Liston
    DOI: 10.1061/(ASCE)1532-6748(2003)3:2(86)
    Publisher: American Society of Civil Engineers
    Abstract: The application of 4-D models to the Ray and Maria Stata Center project on the campus of the Massachusetts Institute of Technology is summarized. The general contractor’s decision to build the 4-D models is discussed, and details of the 4-D modeling process are given to illustrate the effect of the models on the project. It is shown that once a 3-D model is available a 4-D model can be created relatively cheaply, thereby extracting additional benefit from the investment made in generating the 3-D model.
    • Download: (871.6Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Four-Dimensional Modeling to Support Construction Planning of the Stata Center Project

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/55336
    Collections
    • Leadership and Management in Engineering

    Show full item record

    contributor authorJessica Hastings
    contributor authorJohn Kibiloski
    contributor authorMartin Fischer
    contributor authorJohn Haymaker
    contributor authorKathleen Liston
    date accessioned2017-05-08T21:32:19Z
    date available2017-05-08T21:32:19Z
    date copyrightApril 2003
    date issued2003
    identifier other%28asce%291532-6748%282003%293%3A2%2886%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/55336
    description abstractThe application of 4-D models to the Ray and Maria Stata Center project on the campus of the Massachusetts Institute of Technology is summarized. The general contractor’s decision to build the 4-D models is discussed, and details of the 4-D modeling process are given to illustrate the effect of the models on the project. It is shown that once a 3-D model is available a 4-D model can be created relatively cheaply, thereby extracting additional benefit from the investment made in generating the 3-D model.
    publisherAmerican Society of Civil Engineers
    titleFour-Dimensional Modeling to Support Construction Planning of the Stata Center Project
    typeJournal Paper
    journal volume3
    journal issue2
    journal titleLeadership and Management in Engineering
    identifier doi10.1061/(ASCE)1532-6748(2003)3:2(86)
    treeLeadership and Management in Engineering:;2003:;Volume ( 003 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian