YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Practice Periodical of Hazardous, Toxic, and Radioactive Waste Management
    • View Item
    •   YE&T Library
    • ASCE
    • Practice Periodical of Hazardous, Toxic, and Radioactive Waste Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Using Variances to Comply with Resource Conservation and Recovery Act Treatment Standards

    Source: Practice Periodical of Hazardous, Toxic, and Radioactive Waste Management:;2002:;Volume ( 006 ):;issue: 004
    Author:
    Nancy L. Ranek
    DOI: 10.1061/(ASCE)1090-025X(2002)6:4(227)
    Publisher: American Society of Civil Engineers
    Abstract: When a waste generated, treated, or disposed of at a site in the United States is classified as hazardous under the Resource Conservation and Recovery Act and is destined for land disposal, the waste manager responsible for that site must select an approach to comply with land disposal restrictions (LDR) treatment standards. This paper focuses on the approach of obtaining a variance from existing, applicable LDR treatment standards. It describes the types of available variances, which include (1) determination of equivalent treatment (DET); (2) treatability variance; and (3) treatment variance for contaminated soil. The process for obtaining each type of variance is also described. Data are presented showing that historically the U.S. Environmental Protection Agency (EPA) processed DET petitions within one year of their date of submission. However, a 1999 EPA policy change added public participation to the DET petition review, which may lengthen processing time in the future. Regarding site-specific treatability variances, data are presented showing an EPA processing time of between 10 and 16 months. Only one generically applicable treatability variance has been granted, which took 30 months to process. No treatment variances for contaminated soil, which were added to the federal LDR program in 1998, are identified as having been granted.
    • Download: (120.2Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Using Variances to Comply with Resource Conservation and Recovery Act Treatment Standards

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/53700
    Collections
    • Practice Periodical of Hazardous, Toxic, and Radioactive Waste Management

    Show full item record

    contributor authorNancy L. Ranek
    date accessioned2017-05-08T21:29:48Z
    date available2017-05-08T21:29:48Z
    date copyrightOctober 2002
    date issued2002
    identifier other%28asce%291090-025x%282002%296%3A4%28227%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/53700
    description abstractWhen a waste generated, treated, or disposed of at a site in the United States is classified as hazardous under the Resource Conservation and Recovery Act and is destined for land disposal, the waste manager responsible for that site must select an approach to comply with land disposal restrictions (LDR) treatment standards. This paper focuses on the approach of obtaining a variance from existing, applicable LDR treatment standards. It describes the types of available variances, which include (1) determination of equivalent treatment (DET); (2) treatability variance; and (3) treatment variance for contaminated soil. The process for obtaining each type of variance is also described. Data are presented showing that historically the U.S. Environmental Protection Agency (EPA) processed DET petitions within one year of their date of submission. However, a 1999 EPA policy change added public participation to the DET petition review, which may lengthen processing time in the future. Regarding site-specific treatability variances, data are presented showing an EPA processing time of between 10 and 16 months. Only one generically applicable treatability variance has been granted, which took 30 months to process. No treatment variances for contaminated soil, which were added to the federal LDR program in 1998, are identified as having been granted.
    publisherAmerican Society of Civil Engineers
    titleUsing Variances to Comply with Resource Conservation and Recovery Act Treatment Standards
    typeJournal Paper
    journal volume6
    journal issue4
    journal titlePractice Periodical of Hazardous, Toxic, and Radioactive Waste Management
    identifier doi10.1061/(ASCE)1090-025X(2002)6:4(227)
    treePractice Periodical of Hazardous, Toxic, and Radioactive Waste Management:;2002:;Volume ( 006 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian