YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Practice Periodical of Hazardous, Toxic, and Radioactive Waste Management
    • View Item
    •   YE&T Library
    • ASCE
    • Practice Periodical of Hazardous, Toxic, and Radioactive Waste Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Long-Term Performance Monitoring at Natural Attenuation Site

    Source: Practice Periodical of Hazardous, Toxic, and Radioactive Waste Management:;2002:;Volume ( 006 ):;issue: 003
    Author:
    Rao Surampalli
    ,
    Shankha Banerji
    DOI: 10.1061/(ASCE)1090-025X(2002)6:3(173)
    Publisher: American Society of Civil Engineers
    Abstract: Long-term monitoring is an integral part of the natural attenuation remediation process. It is needed to monitor the migration of a contaminated groundwater plume over time and to evaluate the extent of natural remediation that is occurring. It involves the placement of four types of monitoring wells: up-gradient, side-gradient, impacted source, and down-gradient wells. The monitoring of groundwater samples from these wells should provide information to evaluate if the objectives of the natural attenuation process are being met. The sampling analytical plan depends upon the type of contaminants involved. The frequency of sampling should be sufficient to detect in a timely manner any changes in plume contaminant degradation behavior. It should also be flexible enough to make changes, should there be a need. The monitoring program should be continued until the objectives of the natural attenuation process have been met, and possibly longer, if necessary, to ensure that health and environment threats are protected. If during the monitoring process the plume behavior is found to change for the worse (i.e., plume migration is faster or further than before), a contingency plan should be in place to protect the down-gradient receptors. The contingency plan usually requires an engineered remediation plan to reduce the negative impact of the plume on the down-gradient receptors.
    • Download: (37.75Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Long-Term Performance Monitoring at Natural Attenuation Site

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/53691
    Collections
    • Practice Periodical of Hazardous, Toxic, and Radioactive Waste Management

    Show full item record

    contributor authorRao Surampalli
    contributor authorShankha Banerji
    date accessioned2017-05-08T21:29:47Z
    date available2017-05-08T21:29:47Z
    date copyrightJuly 2002
    date issued2002
    identifier other%28asce%291090-025x%282002%296%3A3%28173%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/53691
    description abstractLong-term monitoring is an integral part of the natural attenuation remediation process. It is needed to monitor the migration of a contaminated groundwater plume over time and to evaluate the extent of natural remediation that is occurring. It involves the placement of four types of monitoring wells: up-gradient, side-gradient, impacted source, and down-gradient wells. The monitoring of groundwater samples from these wells should provide information to evaluate if the objectives of the natural attenuation process are being met. The sampling analytical plan depends upon the type of contaminants involved. The frequency of sampling should be sufficient to detect in a timely manner any changes in plume contaminant degradation behavior. It should also be flexible enough to make changes, should there be a need. The monitoring program should be continued until the objectives of the natural attenuation process have been met, and possibly longer, if necessary, to ensure that health and environment threats are protected. If during the monitoring process the plume behavior is found to change for the worse (i.e., plume migration is faster or further than before), a contingency plan should be in place to protect the down-gradient receptors. The contingency plan usually requires an engineered remediation plan to reduce the negative impact of the plume on the down-gradient receptors.
    publisherAmerican Society of Civil Engineers
    titleLong-Term Performance Monitoring at Natural Attenuation Site
    typeJournal Paper
    journal volume6
    journal issue3
    journal titlePractice Periodical of Hazardous, Toxic, and Radioactive Waste Management
    identifier doi10.1061/(ASCE)1090-025X(2002)6:3(173)
    treePractice Periodical of Hazardous, Toxic, and Radioactive Waste Management:;2002:;Volume ( 006 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian