YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Practice Periodical of Hazardous, Toxic, and Radioactive Waste Management
    • View Item
    •   YE&T Library
    • ASCE
    • Practice Periodical of Hazardous, Toxic, and Radioactive Waste Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Pilot Study Evaluation of Pulsed Plasma Arc Ground-Water Treatment

    Source: Practice Periodical of Hazardous, Toxic, and Radioactive Waste Management:;1999:;Volume ( 003 ):;issue: 004
    Author:
    Andrew Curtis Elmore
    ,
    William A. Lee, P.E.
    DOI: 10.1061/(ASCE)1090-025X(1999)3:4(178)
    Publisher: American Society of Civil Engineers
    Abstract: Pilot-scale ground-water treatability studies were performed at the former Nebraska Ordnance Plant site near Mead, Nebr. Ground water at the former Nebraska Ordnance Plant is contaminated by trichloroethene (TCE) and hexahydro-1,3,5-trinitro-1,3,5-triazine (RDX). Technologies selected for pilot testing were the advanced oxidation processes of UV light with hydrogen peroxide, UV/ozone, and hydrogen peroxide/ozone (peroxone). In addition, pulsed plasma arc, an innovative wastewater treatment process related to advanced oxidation processes, was tested. The studies were planned in two phases. Phase I was to demonstrate the ability of the technologies to meet treatment goals. Phase II was to optimize each technology. A third phase was planned for plasma arc to test the long-term reliability of the process. UV/hydrogen peroxide reduced both TCE and RDX to below detection levels. UV/ozone treated all RDX concentrations to below detection levels, but did not always meet TCE goals. Peroxone did not meet RDX goals, but was generally successful on TCE. Pulsed plasma arc achieved some reduction of both TCE and RDX concentrations but did not meet treatment goals for either compound.
    • Download: (50.14Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Pilot Study Evaluation of Pulsed Plasma Arc Ground-Water Treatment

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/53611
    Collections
    • Practice Periodical of Hazardous, Toxic, and Radioactive Waste Management

    Show full item record

    contributor authorAndrew Curtis Elmore
    contributor authorWilliam A. Lee, P.E.
    date accessioned2017-05-08T21:29:41Z
    date available2017-05-08T21:29:41Z
    date copyrightOctober 1999
    date issued1999
    identifier other%28asce%291090-025x%281999%293%3A4%28178%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/53611
    description abstractPilot-scale ground-water treatability studies were performed at the former Nebraska Ordnance Plant site near Mead, Nebr. Ground water at the former Nebraska Ordnance Plant is contaminated by trichloroethene (TCE) and hexahydro-1,3,5-trinitro-1,3,5-triazine (RDX). Technologies selected for pilot testing were the advanced oxidation processes of UV light with hydrogen peroxide, UV/ozone, and hydrogen peroxide/ozone (peroxone). In addition, pulsed plasma arc, an innovative wastewater treatment process related to advanced oxidation processes, was tested. The studies were planned in two phases. Phase I was to demonstrate the ability of the technologies to meet treatment goals. Phase II was to optimize each technology. A third phase was planned for plasma arc to test the long-term reliability of the process. UV/hydrogen peroxide reduced both TCE and RDX to below detection levels. UV/ozone treated all RDX concentrations to below detection levels, but did not always meet TCE goals. Peroxone did not meet RDX goals, but was generally successful on TCE. Pulsed plasma arc achieved some reduction of both TCE and RDX concentrations but did not meet treatment goals for either compound.
    publisherAmerican Society of Civil Engineers
    titlePilot Study Evaluation of Pulsed Plasma Arc Ground-Water Treatment
    typeJournal Paper
    journal volume3
    journal issue4
    journal titlePractice Periodical of Hazardous, Toxic, and Radioactive Waste Management
    identifier doi10.1061/(ASCE)1090-025X(1999)3:4(178)
    treePractice Periodical of Hazardous, Toxic, and Radioactive Waste Management:;1999:;Volume ( 003 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian