Show simple item record

contributor authorPaul J. Bullock
contributor authorJohn H. Schmertmann
contributor authorMichael C. McVay
contributor authorFrank C. Townsend
date accessioned2017-05-08T21:28:10Z
date available2017-05-08T21:28:10Z
date copyrightMarch 2005
date issued2005
identifier other%28asce%291090-0241%282005%29131%3A3%28292%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/52666
description abstractThe available literature indicates that pile side shear increases almost linearly with the logarithm of time elapsed after driving, sometimes described using a dimensionless setup factor. A test pile program conducted by the University of Florida measured side shear setup (SSS) for up to 4.7 years on five,
publisherAmerican Society of Civil Engineers
titleSide Shear Setup. I: Test Piles Driven in Florida
typeJournal Paper
journal volume131
journal issue3
journal titleJournal of Geotechnical and Geoenvironmental Engineering
identifier doi10.1061/(ASCE)1090-0241(2005)131:3(292)
treeJournal of Geotechnical and Geoenvironmental Engineering:;2005:;Volume ( 131 ):;issue: 003
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record