Show simple item record

contributor authorSheng-hong Chen
contributor authorMing-yi Xu
contributor authorIsam Shahrour
contributor authorPeter Egger
date accessioned2017-05-08T21:27:36Z
date available2017-05-08T21:27:36Z
date copyrightNovember 2003
date issued2003
identifier other%28asce%291090-0241%282003%29129%3A11%28977%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/52275
description abstractThis paper presents the use of the trial load method and the block element method with elastoviscoplastic discontinuities for analysis of arch dams. The arch dam is considered as an arch-cantilever system and the foundation as a block element system. With the displacement compatibility condition at the contact surface of the dam and the foundation (including abutment), the governing equations of the arch dam and foundation are established. These methods are used for the analysis of the double curvature arch dam with complex geology conditions of the Xiaowan Hydroelectric Project in China. The deformation and stress states in both the dam body and the foundation are determined. Furthermore, the stability safety factors of the foundation and the abutment are calculated at the same time, which allows for an optimal design of the arch dam considering the strength, the deformation and the stability of the dam and foundation.
publisherAmerican Society of Civil Engineers
titleAnalysis of Arch Dams Using Coupled Trial Load and Block Element Methods
typeJournal Paper
journal volume129
journal issue11
journal titleJournal of Geotechnical and Geoenvironmental Engineering
identifier doi10.1061/(ASCE)1090-0241(2003)129:11(977)
treeJournal of Geotechnical and Geoenvironmental Engineering:;2003:;Volume ( 129 ):;issue: 011
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record