YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Bridge Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Bridge Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Experimental Study on Prefabricated Concrete Bridge Girder-to-Girder Intermittent Bolted Connections System

    Source: Journal of Bridge Engineering:;2007:;Volume ( 012 ):;issue: 005
    Author:
    Bijal N. Shah
    ,
    Khaled Sennah
    ,
    M. Reza Kianoush
    ,
    Siyin Tu
    ,
    Clifford Lam
    DOI: 10.1061/(ASCE)1084-0702(2007)12:5(570)
    Publisher: American Society of Civil Engineers
    Abstract: This paper reports on a new bridge deck slab flange-to-flange connection system for precast deck bulb tee (DBT) girders. In prefabricated bridge system made of DBT girders, the concrete deck slab is cast with the prestressed girder in a controlled environment at the fabrication facility and then shipped to the bridge site. This system requires that the individual prefabricated girders be connected through their flanges to make it continuous for live load distribution. The objectives of this study are to develop an intermittent bolted connection for DBT bridge girders and to provide experimental data on the ultimate strength of the connection system. This includes identifying the crack formation and propagation, failure mode, and ultimate load carrying capacity. In this study, three different types of intermittent bolted connection were developed. Four actual-size bridge panels were fabricated and then tested to collapse. The effects of the size and the level of the fixity of the connecting steel plates, as well as the location of the wheel load were examined. The developed joint was considered successful if the experimental wheel load satisfied the requirements specified in North American bridge codes. It was concluded that location of the wheel load at the deck slab joint affected the ultimate load carrying capacity of the connections developed. Failure of the joint was observed to be due to either excessive deformation and yielding of the connecting steel plates or debonding of the embedded studs in concrete.
    • Download: (1.049Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Experimental Study on Prefabricated Concrete Bridge Girder-to-Girder Intermittent Bolted Connections System

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/51056
    Collections
    • Journal of Bridge Engineering

    Show full item record

    contributor authorBijal N. Shah
    contributor authorKhaled Sennah
    contributor authorM. Reza Kianoush
    contributor authorSiyin Tu
    contributor authorClifford Lam
    date accessioned2017-05-08T21:25:38Z
    date available2017-05-08T21:25:38Z
    date copyrightSeptember 2007
    date issued2007
    identifier other%28asce%291084-0702%282007%2912%3A5%28570%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/51056
    description abstractThis paper reports on a new bridge deck slab flange-to-flange connection system for precast deck bulb tee (DBT) girders. In prefabricated bridge system made of DBT girders, the concrete deck slab is cast with the prestressed girder in a controlled environment at the fabrication facility and then shipped to the bridge site. This system requires that the individual prefabricated girders be connected through their flanges to make it continuous for live load distribution. The objectives of this study are to develop an intermittent bolted connection for DBT bridge girders and to provide experimental data on the ultimate strength of the connection system. This includes identifying the crack formation and propagation, failure mode, and ultimate load carrying capacity. In this study, three different types of intermittent bolted connection were developed. Four actual-size bridge panels were fabricated and then tested to collapse. The effects of the size and the level of the fixity of the connecting steel plates, as well as the location of the wheel load were examined. The developed joint was considered successful if the experimental wheel load satisfied the requirements specified in North American bridge codes. It was concluded that location of the wheel load at the deck slab joint affected the ultimate load carrying capacity of the connections developed. Failure of the joint was observed to be due to either excessive deformation and yielding of the connecting steel plates or debonding of the embedded studs in concrete.
    publisherAmerican Society of Civil Engineers
    titleExperimental Study on Prefabricated Concrete Bridge Girder-to-Girder Intermittent Bolted Connections System
    typeJournal Paper
    journal volume12
    journal issue5
    journal titleJournal of Bridge Engineering
    identifier doi10.1061/(ASCE)1084-0702(2007)12:5(570)
    treeJournal of Bridge Engineering:;2007:;Volume ( 012 ):;issue: 005
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian