YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Resolving Disputes over Contract Notice Requirements

    Source: Journal of Construction Engineering and Management:;1990:;Volume ( 116 ):;issue: 004
    Author:
    H. Randolph Thomas
    ,
    Gary R. Smith
    ,
    Dennis E. Wright
    DOI: 10.1061/(ASCE)0733-9364(1990)116:4(738)
    Publisher: American Society of Civil Engineers
    Abstract: This paper describes the legal aspects of contract notice requirements. It is intended as a guide for contract administrators and contractors to help determine if the requirement for written notice has been satisfied as a prerequisite for a claim for an equitable adjustment. Based on an examination of case law, four primary rules are given. Does the notice clause apply? Was the requirement satisfied? Was the owner prejudiced? Can the requirement be waived and was it? Issues under each rule are identified, and examples are given. Other related aspects are also discussed, such as the importance of contract breach, form of communication, role of schedules, requirements for additional detail, and apparent authority. Recommended practices are also given.
    • Download: (1.278Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Resolving Disputes over Contract Notice Requirements

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/50730
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorH. Randolph Thomas
    contributor authorGary R. Smith
    contributor authorDennis E. Wright
    date accessioned2017-05-08T21:25:10Z
    date available2017-05-08T21:25:10Z
    date copyrightDecember 1990
    date issued1990
    identifier other%28asce%290733-9364%281990%29116%3A4%28738%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/50730
    description abstractThis paper describes the legal aspects of contract notice requirements. It is intended as a guide for contract administrators and contractors to help determine if the requirement for written notice has been satisfied as a prerequisite for a claim for an equitable adjustment. Based on an examination of case law, four primary rules are given. Does the notice clause apply? Was the requirement satisfied? Was the owner prejudiced? Can the requirement be waived and was it? Issues under each rule are identified, and examples are given. Other related aspects are also discussed, such as the importance of contract breach, form of communication, role of schedules, requirements for additional detail, and apparent authority. Recommended practices are also given.
    publisherAmerican Society of Civil Engineers
    titleResolving Disputes over Contract Notice Requirements
    typeJournal Paper
    journal volume116
    journal issue4
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(1990)116:4(738)
    treeJournal of Construction Engineering and Management:;1990:;Volume ( 116 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian