YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Bridge Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Bridge Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Full-Scale Testing of Procedures for Assembling Trunnion-Hub-Girder in Bascule Bridges

    Source: Journal of Bridge Engineering:;2003:;Volume ( 008 ):;issue: 004
    Author:
    Glen Besterfield
    ,
    Sanjeev Nichani
    ,
    Autar K. Kaw
    ,
    Thomas Eason
    DOI: 10.1061/(ASCE)1084-0702(2003)8:4(204)
    Publisher: American Society of Civil Engineers
    Abstract: To simulate a trunnion-hub-girder (THG) assembly for bascule bridges, two full-scale laboratory tests were conducted for quantifying stresses at previously observed failure locations and for identifying a favorable assembly procedure. One assembly procedure, AP#1, cools the trunnion for a shrink fit into the hub, followed by cooling of the trunnion-hub assembly to shrink fit it into the girder. Using AP#1, development of cracks on the hub was observed in one THG assembly, and, in yet another assembly, the trunnion got stuck in the hub before full insertion could take place. Large hoop stresses and low temperatures were observed at the trunnion-hub interface when the trunnion-hub assembly was cooled for insertion into the girder. Since fracture toughness of THG parts decreases with temperature, allowable crack lengths were small. In an alternative assembly procedure, AP#2, where the hub is shrink fitted into the girder first, followed by cooling the trunnion and shrink fitting it into the hub-girder assembly, the allowable crack length was determined to be double the allowable crack length of AP#1. Hence, for the given full-scale geometry and interference values, assembly procedure AP#2 was found to be better than AP#1.
    • Download: (671.2Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Full-Scale Testing of Procedures for Assembling Trunnion-Hub-Girder in Bascule Bridges

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/50677
    Collections
    • Journal of Bridge Engineering

    Show full item record

    contributor authorGlen Besterfield
    contributor authorSanjeev Nichani
    contributor authorAutar K. Kaw
    contributor authorThomas Eason
    date accessioned2017-05-08T21:25:06Z
    date available2017-05-08T21:25:06Z
    date copyrightJuly 2003
    date issued2003
    identifier other%28asce%291084-0702%282003%298%3A4%28204%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/50677
    description abstractTo simulate a trunnion-hub-girder (THG) assembly for bascule bridges, two full-scale laboratory tests were conducted for quantifying stresses at previously observed failure locations and for identifying a favorable assembly procedure. One assembly procedure, AP#1, cools the trunnion for a shrink fit into the hub, followed by cooling of the trunnion-hub assembly to shrink fit it into the girder. Using AP#1, development of cracks on the hub was observed in one THG assembly, and, in yet another assembly, the trunnion got stuck in the hub before full insertion could take place. Large hoop stresses and low temperatures were observed at the trunnion-hub interface when the trunnion-hub assembly was cooled for insertion into the girder. Since fracture toughness of THG parts decreases with temperature, allowable crack lengths were small. In an alternative assembly procedure, AP#2, where the hub is shrink fitted into the girder first, followed by cooling the trunnion and shrink fitting it into the hub-girder assembly, the allowable crack length was determined to be double the allowable crack length of AP#1. Hence, for the given full-scale geometry and interference values, assembly procedure AP#2 was found to be better than AP#1.
    publisherAmerican Society of Civil Engineers
    titleFull-Scale Testing of Procedures for Assembling Trunnion-Hub-Girder in Bascule Bridges
    typeJournal Paper
    journal volume8
    journal issue4
    journal titleJournal of Bridge Engineering
    identifier doi10.1061/(ASCE)1084-0702(2003)8:4(204)
    treeJournal of Bridge Engineering:;2003:;Volume ( 008 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian