YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Bridge Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Bridge Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Optimization of HPS 70W Applications

    Source: Journal of Bridge Engineering:;2002:;Volume ( 007 ):;issue: 001
    Author:
    Edward P. Wasserman
    DOI: 10.1061/(ASCE)1084-0702(2002)7:1(1)
    Publisher: American Society of Civil Engineers
    Abstract: In February 1996 the Tennessee Department of Transportation, in cooperation with the Federal Highway Administration, the American Iron and Steel Institute, the U.S. Navy, and various steel plate manufacturers, agreed to design the first bridge in the United States to use HPS 485W (70W) steel. Since that time the department has constructed a second bridge using HPS 485W (70W) and has let to contract a third bridge that uses HPS 485W (70W) in both quenched and tempered and thermomechanical controlled processing HPS 485W (70W) steel. This paper will discuss lessons learned in the process and present optimization techniques employed.
    • Download: (250.7Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Optimization of HPS 70W Applications

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/50601
    Collections
    • Journal of Bridge Engineering

    Show full item record

    contributor authorEdward P. Wasserman
    date accessioned2017-05-08T21:24:59Z
    date available2017-05-08T21:24:59Z
    date copyrightJanuary 2002
    date issued2002
    identifier other%28asce%291084-0702%282002%297%3A1%281%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/50601
    description abstractIn February 1996 the Tennessee Department of Transportation, in cooperation with the Federal Highway Administration, the American Iron and Steel Institute, the U.S. Navy, and various steel plate manufacturers, agreed to design the first bridge in the United States to use HPS 485W (70W) steel. Since that time the department has constructed a second bridge using HPS 485W (70W) and has let to contract a third bridge that uses HPS 485W (70W) in both quenched and tempered and thermomechanical controlled processing HPS 485W (70W) steel. This paper will discuss lessons learned in the process and present optimization techniques employed.
    publisherAmerican Society of Civil Engineers
    titleOptimization of HPS 70W Applications
    typeJournal Paper
    journal volume7
    journal issue1
    journal titleJournal of Bridge Engineering
    identifier doi10.1061/(ASCE)1084-0702(2002)7:1(1)
    treeJournal of Bridge Engineering:;2002:;Volume ( 007 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian