London Millennium Bridge: Pedestrian-Induced Lateral VibrationSource: Journal of Bridge Engineering:;2001:;Volume ( 006 ):;issue: 006Author:Pat Dallard
,
Tony Fitzpatrick
,
Anthony Flint
,
Angus Low
,
Roger Ridsdill Smith
,
Michael Willford
,
Mark Roche
DOI: 10.1061/(ASCE)1084-0702(2001)6:6(412)Publisher: American Society of Civil Engineers
Abstract: The London Millennium Footbridge is located across the Thames River in Central London. At its opening on June 10, 2000, the bridge experienced pedestrian-induced lateral vibration. Observations on the day of opening and studies of video footage revealed up to 50 mm of lateral movement of the south span and 70 mm of the center span. The north span did not move substantially. The bridge was closed on June 12, 2000, pending an investigation into the cause of the unexpected lateral movements. This paper highlights the phenomenon of pedestrian-induced lateral vibration on footbridges and the current state of knowledge of the lateral loading effect. Modification of the bridge, introducing extensive passive damping, is currently underway with completion scheduled for the end of 2001.
|
Collections
Show full item record
contributor author | Pat Dallard | |
contributor author | Tony Fitzpatrick | |
contributor author | Anthony Flint | |
contributor author | Angus Low | |
contributor author | Roger Ridsdill Smith | |
contributor author | Michael Willford | |
contributor author | Mark Roche | |
date accessioned | 2017-05-08T21:24:56Z | |
date available | 2017-05-08T21:24:56Z | |
date copyright | December 2001 | |
date issued | 2001 | |
identifier other | %28asce%291084-0702%282001%296%3A6%28412%29.pdf | |
identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/50572 | |
description abstract | The London Millennium Footbridge is located across the Thames River in Central London. At its opening on June 10, 2000, the bridge experienced pedestrian-induced lateral vibration. Observations on the day of opening and studies of video footage revealed up to 50 mm of lateral movement of the south span and 70 mm of the center span. The north span did not move substantially. The bridge was closed on June 12, 2000, pending an investigation into the cause of the unexpected lateral movements. This paper highlights the phenomenon of pedestrian-induced lateral vibration on footbridges and the current state of knowledge of the lateral loading effect. Modification of the bridge, introducing extensive passive damping, is currently underway with completion scheduled for the end of 2001. | |
publisher | American Society of Civil Engineers | |
title | London Millennium Bridge: Pedestrian-Induced Lateral Vibration | |
type | Journal Paper | |
journal volume | 6 | |
journal issue | 6 | |
journal title | Journal of Bridge Engineering | |
identifier doi | 10.1061/(ASCE)1084-0702(2001)6:6(412) | |
tree | Journal of Bridge Engineering:;2001:;Volume ( 006 ):;issue: 006 | |
contenttype | Fulltext |