YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Consequential Equipment Costs Associated with Lack of Availability and Downtime

    Source: Journal of Construction Engineering and Management:;1990:;Volume ( 116 ):;issue: 004
    Author:
    Michael C. Vorster
    ,
    Jesus M. De La Garza
    DOI: 10.1061/(ASCE)0733-9364(1990)116:4(656)
    Publisher: American Society of Civil Engineers
    Abstract: This paper presents a model that has the capability to quantify the consequential costs of downtime and lack of availability in four categories. The first, associated resource impact costs, deals with the costs that arise when failure in one machine impacts on the productivity and cost‐effectiveness of other machines working in close association with it. The second category, lack‐of‐readiness costs, addresses the cost that may be incurred when a capital asset is rendered idle by the downtime resulting from a prior failure. The third cost category, service level impact costs, deals with the situation that arises when one machine in a pool of resources fails to the extent that other machines in the pool must work in an uneconomical manner to maintain a given service level. The fourth cost category, alternative method impact costs, deals with the consequential costs that arise when failure causes a change in the method of operations. The methodology developed represents a significant step toward the rational quantification of consequential costs. An understanding of the philosophy behind each category, as well as the methodology used for quantification, should make it possible to model most situations, given a little thought and creativity in applying the model.
    • Download: (799.8Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Consequential Equipment Costs Associated with Lack of Availability and Downtime

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/50175
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorMichael C. Vorster
    contributor authorJesus M. De La Garza
    date accessioned2017-05-08T21:24:19Z
    date available2017-05-08T21:24:19Z
    date copyrightDecember 1990
    date issued1990
    identifier other%28asce%290733-9364%281990%29116%3A4%28656%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/50175
    description abstractThis paper presents a model that has the capability to quantify the consequential costs of downtime and lack of availability in four categories. The first, associated resource impact costs, deals with the costs that arise when failure in one machine impacts on the productivity and cost‐effectiveness of other machines working in close association with it. The second category, lack‐of‐readiness costs, addresses the cost that may be incurred when a capital asset is rendered idle by the downtime resulting from a prior failure. The third cost category, service level impact costs, deals with the situation that arises when one machine in a pool of resources fails to the extent that other machines in the pool must work in an uneconomical manner to maintain a given service level. The fourth cost category, alternative method impact costs, deals with the consequential costs that arise when failure causes a change in the method of operations. The methodology developed represents a significant step toward the rational quantification of consequential costs. An understanding of the philosophy behind each category, as well as the methodology used for quantification, should make it possible to model most situations, given a little thought and creativity in applying the model.
    publisherAmerican Society of Civil Engineers
    titleConsequential Equipment Costs Associated with Lack of Availability and Downtime
    typeJournal Paper
    journal volume116
    journal issue4
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(1990)116:4(656)
    treeJournal of Construction Engineering and Management:;1990:;Volume ( 116 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian