YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Hydrologic Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Hydrologic Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Ecology Ditch: A Best Management Practice for Storm Water Runoff Mitigation

    Source: Journal of Hydrologic Engineering:;2003:;Volume ( 008 ):;issue: 003
    Author:
    Michael E. Barber
    ,
    Steven G. King
    ,
    David R. Yonge
    ,
    Wade E. Hathhorn
    DOI: 10.1061/(ASCE)1084-0699(2003)8:3(111)
    Publisher: American Society of Civil Engineers
    Abstract: A full-scale physical model of a modified infiltration trench was constructed to test a new storm water best management practice called an ecology ditch. The ditch was constructed using compost, sand, and gravel, and a perforated drain pipe. A series of 14 tests were conducted on the physical model. The tests controlled rainfall application and overland roadway runoff amounts and monitored outflow from the discharge pipe. The objectives were to increase the time to peak and reduce the peak discharge coming out of the pipe. The results were also used to calibrate a modified existing unsaturated two-dimensional groundwater flow code. After the code was calibrated, computer simulations were performed to determine the effects of storm size, rainfall distribution, constant rainfall application, media type, initial conditions, and the physical size of the ecology ditch. The simulations used 24-hour duration storm sizes of 0.64, 1.27, 2.54, 3.81, 5.08, and 6.35 cm (0.25 to 2.5 in.). Peak reduction was found to depend greatly on input hydrograph distribution and the ability of the soil to store water. In turn, the storage in the soil was found to be dependent on the intensities of the input hydrograph. The peak delay time for larger storms was quantifiable since it depended on the saturated hydraulic conductivity and the distance of the flow path. For larger storms, the ecology ditch managed a peak reduction in the range of 10 to 50%.
    • Download: (288.1Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Ecology Ditch: A Best Management Practice for Storm Water Runoff Mitigation

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/49706
    Collections
    • Journal of Hydrologic Engineering

    Show full item record

    contributor authorMichael E. Barber
    contributor authorSteven G. King
    contributor authorDavid R. Yonge
    contributor authorWade E. Hathhorn
    date accessioned2017-05-08T21:23:36Z
    date available2017-05-08T21:23:36Z
    date copyrightMay 2003
    date issued2003
    identifier other%28asce%291084-0699%282003%298%3A3%28111%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/49706
    description abstractA full-scale physical model of a modified infiltration trench was constructed to test a new storm water best management practice called an ecology ditch. The ditch was constructed using compost, sand, and gravel, and a perforated drain pipe. A series of 14 tests were conducted on the physical model. The tests controlled rainfall application and overland roadway runoff amounts and monitored outflow from the discharge pipe. The objectives were to increase the time to peak and reduce the peak discharge coming out of the pipe. The results were also used to calibrate a modified existing unsaturated two-dimensional groundwater flow code. After the code was calibrated, computer simulations were performed to determine the effects of storm size, rainfall distribution, constant rainfall application, media type, initial conditions, and the physical size of the ecology ditch. The simulations used 24-hour duration storm sizes of 0.64, 1.27, 2.54, 3.81, 5.08, and 6.35 cm (0.25 to 2.5 in.). Peak reduction was found to depend greatly on input hydrograph distribution and the ability of the soil to store water. In turn, the storage in the soil was found to be dependent on the intensities of the input hydrograph. The peak delay time for larger storms was quantifiable since it depended on the saturated hydraulic conductivity and the distance of the flow path. For larger storms, the ecology ditch managed a peak reduction in the range of 10 to 50%.
    publisherAmerican Society of Civil Engineers
    titleEcology Ditch: A Best Management Practice for Storm Water Runoff Mitigation
    typeJournal Paper
    journal volume8
    journal issue3
    journal titleJournal of Hydrologic Engineering
    identifier doi10.1061/(ASCE)1084-0699(2003)8:3(111)
    treeJournal of Hydrologic Engineering:;2003:;Volume ( 008 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian