YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Structural Design and Construction Practice
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Structural Design and Construction Practice
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Construction Learning Curves

    Source: Practice Periodical on Structural Design and Construction:;2009:;Volume ( 014 ):;issue: 001
    Author:
    H. Randolph Thomas
    DOI: 10.1061/(ASCE)1084-0680(2009)14:1(14)
    Publisher: American Society of Civil Engineers
    Abstract: Construction learning curves frequently appear in contractor claims and sometimes are the basis for calculating some portion of monetary damages. Therefore, it is incumbent on all parties to understand the proper use of learning curves and the implication of their use. Learning curves originated in the aircraft manufacturing industry and have been applied in the construction industry without much thought as to the factors that lead to true learning and whether any learning actually took place. Based on the writer’s experience, it is suggested that three things need to be present for learning to take place: (1) there should be something sufficiently complex about the operation to facilitate learning; (2) there should be repetition in the units being constructed; and (3) management must create a stable work environment. It is suggested that in most instances, the underlying factors are not present and that true learning does not occur. Most of the time, the appearance of learning is caused by disruptions that occur early in the construction timeframe. Most purported learning curves are plotted using cumulative data rather than unit productivity data. It is shown using an actual project, how cumulative data gives a distorted view of performance. It is suggested that in some instances, a learning curve is a sign of a poorly managed project. As many as 14 learning curves from actual projects, most where there were no contractor claims, are included to illustrate the points made in the paper.
    • Download: (182.8Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Construction Learning Curves

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/49308
    Collections
    • Journal of Structural Design and Construction Practice

    Show full item record

    contributor authorH. Randolph Thomas
    date accessioned2017-05-08T21:23:01Z
    date available2017-05-08T21:23:01Z
    date copyrightFebruary 2009
    date issued2009
    identifier other%28asce%291084-0680%282009%2914%3A1%2814%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/49308
    description abstractConstruction learning curves frequently appear in contractor claims and sometimes are the basis for calculating some portion of monetary damages. Therefore, it is incumbent on all parties to understand the proper use of learning curves and the implication of their use. Learning curves originated in the aircraft manufacturing industry and have been applied in the construction industry without much thought as to the factors that lead to true learning and whether any learning actually took place. Based on the writer’s experience, it is suggested that three things need to be present for learning to take place: (1) there should be something sufficiently complex about the operation to facilitate learning; (2) there should be repetition in the units being constructed; and (3) management must create a stable work environment. It is suggested that in most instances, the underlying factors are not present and that true learning does not occur. Most of the time, the appearance of learning is caused by disruptions that occur early in the construction timeframe. Most purported learning curves are plotted using cumulative data rather than unit productivity data. It is shown using an actual project, how cumulative data gives a distorted view of performance. It is suggested that in some instances, a learning curve is a sign of a poorly managed project. As many as 14 learning curves from actual projects, most where there were no contractor claims, are included to illustrate the points made in the paper.
    publisherAmerican Society of Civil Engineers
    titleConstruction Learning Curves
    typeJournal Paper
    journal volume14
    journal issue1
    journal titlePractice Periodical on Structural Design and Construction
    identifier doi10.1061/(ASCE)1084-0680(2009)14:1(14)
    treePractice Periodical on Structural Design and Construction:;2009:;Volume ( 014 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian