YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Structural Design and Construction Practice
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Structural Design and Construction Practice
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Rapid Replacement of Four GDOT Bridge Decks

    Source: Practice Periodical on Structural Design and Construction:;2007:;Volume ( 012 ):;issue: 001
    Author:
    Josh Umphrey
    ,
    Derek Beck
    ,
    G. Ed Ramey
    ,
    Mary L. Hughes
    DOI: 10.1061/(ASCE)1084-0680(2007)12:1(48)
    Publisher: American Society of Civil Engineers
    Abstract: The objectives of the research reported in this paper were to monitor and document the rapid bridge deck replacement work of the Georgia Department of Transportation (GDOT) on two bridges in Gainesville, Ga., and two bridges in Atlanta. Documentation of the GDOT work included a time sequence, deck replacement square footage per work period, total construction time, typical work period construction tasks, and photographic display/discussion of the deck replacement work. The precast exodermic deck panel system used by the GDOT provided an excellent means for rapid bridge deck replacement while under staged construction/concurrent traffic conditions. The GDOT work was completed within the imposed time limits while maintaining minimum traffic interruption.
    • Download: (3.534Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Rapid Replacement of Four GDOT Bridge Decks

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/49249
    Collections
    • Journal of Structural Design and Construction Practice

    Show full item record

    contributor authorJosh Umphrey
    contributor authorDerek Beck
    contributor authorG. Ed Ramey
    contributor authorMary L. Hughes
    date accessioned2017-05-08T21:22:56Z
    date available2017-05-08T21:22:56Z
    date copyrightFebruary 2007
    date issued2007
    identifier other%28asce%291084-0680%282007%2912%3A1%2848%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/49249
    description abstractThe objectives of the research reported in this paper were to monitor and document the rapid bridge deck replacement work of the Georgia Department of Transportation (GDOT) on two bridges in Gainesville, Ga., and two bridges in Atlanta. Documentation of the GDOT work included a time sequence, deck replacement square footage per work period, total construction time, typical work period construction tasks, and photographic display/discussion of the deck replacement work. The precast exodermic deck panel system used by the GDOT provided an excellent means for rapid bridge deck replacement while under staged construction/concurrent traffic conditions. The GDOT work was completed within the imposed time limits while maintaining minimum traffic interruption.
    publisherAmerican Society of Civil Engineers
    titleRapid Replacement of Four GDOT Bridge Decks
    typeJournal Paper
    journal volume12
    journal issue1
    journal titlePractice Periodical on Structural Design and Construction
    identifier doi10.1061/(ASCE)1084-0680(2007)12:1(48)
    treePractice Periodical on Structural Design and Construction:;2007:;Volume ( 012 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian