contributor author | Eul-Bum Lee | |
contributor author | C. William Ibbs | |
contributor author | David Thomas | |
date accessioned | 2017-05-08T21:21:25Z | |
date available | 2017-05-08T21:21:25Z | |
date copyright | December 2005 | |
date issued | 2005 | |
identifier other | %28asce%291076-0342%282005%2911%3A4%28250%29.pdf | |
identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/48244 | |
description abstract | This paper introduces an innovative approach to development of construction and traffic management plans for the I-15 Devore project, a fast-track urban freeway reconstruction project with high traffic volume in Southern California. The goal of this approach is to determine the most economical reconstruction closure scenario by integrating construction schedule, traffic delay, and agency cost. Construction Analysis for Pavement Rehabilitation Strategies ( | |
publisher | American Society of Civil Engineers | |
title | Minimizing Total Cost for Urban Freeway Reconstruction with Integrated Construction/Traffic Analysis | |
type | Journal Paper | |
journal volume | 11 | |
journal issue | 4 | |
journal title | Journal of Infrastructure Systems | |
identifier doi | 10.1061/(ASCE)1076-0342(2005)11:4(250) | |
tree | Journal of Infrastructure Systems:;2005:;Volume ( 011 ):;issue: 004 | |
contenttype | Fulltext | |