YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Infrastructure Systems
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Infrastructure Systems
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Screening Cycle Decision Modeling for Infrastructure Management

    Source: Journal of Infrastructure Systems:;2000:;Volume ( 006 ):;issue: 004
    Author:
    Stephen T. Staneff
    ,
    C. William Ibbs
    ,
    Robert M. Oliver
    DOI: 10.1061/(ASCE)1076-0342(2000)6:4(145)
    Publisher: American Society of Civil Engineers
    Abstract: Those responsible for the supervision of a collection, or group, of infrastructure-related structures often create programs to screen those structures for safety. These programs systematically move through the group, identifying some structures for further investigation and others as adequate. Because such screening programs take time and effort, there is a time lag for a structure between one screening and the next. This paper examines two major issues: the choice between available tests in a screening system, and the identification of structures as adequate. The effect of the time lag between screens is also examined. The proposed screening model assists the user in deciding when to move to another structure, allows the iteration of a present analysis on the present structure using different assumptions, and aids in deciding whether to accept a “safe” judgment for a structure. The latter, a recognition of the significant potential effects of even a small probability that an unsafe structure has been declared “safe,” is analyzed in detail through sensitivity analysis. It is demonstrated that carefully estimated values for the variables underlying a screening model are critical when designing such a model. A design assumption that screening system tests should decrease in conservatism with increasing complexity and cost is challenged and found to be false in one case, thus requiring investigation when screening systems are designed.
    • Download: (245.5Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Screening Cycle Decision Modeling for Infrastructure Management

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/48125
    Collections
    • Journal of Infrastructure Systems

    Show full item record

    contributor authorStephen T. Staneff
    contributor authorC. William Ibbs
    contributor authorRobert M. Oliver
    date accessioned2017-05-08T21:21:12Z
    date available2017-05-08T21:21:12Z
    date copyrightDecember 2000
    date issued2000
    identifier other%28asce%291076-0342%282000%296%3A4%28145%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/48125
    description abstractThose responsible for the supervision of a collection, or group, of infrastructure-related structures often create programs to screen those structures for safety. These programs systematically move through the group, identifying some structures for further investigation and others as adequate. Because such screening programs take time and effort, there is a time lag for a structure between one screening and the next. This paper examines two major issues: the choice between available tests in a screening system, and the identification of structures as adequate. The effect of the time lag between screens is also examined. The proposed screening model assists the user in deciding when to move to another structure, allows the iteration of a present analysis on the present structure using different assumptions, and aids in deciding whether to accept a “safe” judgment for a structure. The latter, a recognition of the significant potential effects of even a small probability that an unsafe structure has been declared “safe,” is analyzed in detail through sensitivity analysis. It is demonstrated that carefully estimated values for the variables underlying a screening model are critical when designing such a model. A design assumption that screening system tests should decrease in conservatism with increasing complexity and cost is challenged and found to be false in one case, thus requiring investigation when screening systems are designed.
    publisherAmerican Society of Civil Engineers
    titleScreening Cycle Decision Modeling for Infrastructure Management
    typeJournal Paper
    journal volume6
    journal issue4
    journal titleJournal of Infrastructure Systems
    identifier doi10.1061/(ASCE)1076-0342(2000)6:4(145)
    treeJournal of Infrastructure Systems:;2000:;Volume ( 006 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian