YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Professional Issues in Engineering Education and Practice
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Professional Issues in Engineering Education and Practice
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Assessing Construction Engineering-Related Delays: Egyptian Perspective

    Source: Journal of Professional Issues in Engineering Education and Practice:;2008:;Volume ( 134 ):;issue: 003
    Author:
    Mohamed Marzouk
    ,
    Ahmed El-Dokhmasey
    ,
    Moheeb El-Said
    DOI: 10.1061/(ASCE)1052-3928(2008)134:3(315)
    Publisher: American Society of Civil Engineers
    Abstract: The sources of construction delays include engineering, construction, financial/economic, management/administrative, and force majeure. This paper presents a knowledge-based expert system dedicated to engineering-related delays. Three categories of engineering-related delays are considered in the proposed system. These are: (1) design development; (2) workshop drawings; and (3) project parties changes delays. The knowledge of the system is acquired from literature, Federation International des Ingenieurs-Conseils (FIDIC) contract forms, domain experts, as well as a questionnaire survey. Three classes of participants (consultants, contractors, and employers) have been approached to get their feedback on the cases of engineering-related delays. The design of the questionnaire and criteria for selecting participants are described. The feedback of the participants is analyzed to draw the main causes of engineering-related delays. The proposed system’s built-in rules utilize the procedure of FIDIC contract forms for both design-bid-build and design-build projects. In addition, it provides flexibility in utilizing other customized procedures. The system advises on the claim entitlement, responsibility, and compensability of claims. A case study is presented to demonstrate the capabilities of the proposed expert system.
    • Download: (1.211Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Assessing Construction Engineering-Related Delays: Egyptian Perspective

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/47936
    Collections
    • Journal of Professional Issues in Engineering Education and Practice

    Show full item record

    contributor authorMohamed Marzouk
    contributor authorAhmed El-Dokhmasey
    contributor authorMoheeb El-Said
    date accessioned2017-05-08T21:20:55Z
    date available2017-05-08T21:20:55Z
    date copyrightJuly 2008
    date issued2008
    identifier other%28asce%291052-3928%282008%29134%3A3%28315%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/47936
    description abstractThe sources of construction delays include engineering, construction, financial/economic, management/administrative, and force majeure. This paper presents a knowledge-based expert system dedicated to engineering-related delays. Three categories of engineering-related delays are considered in the proposed system. These are: (1) design development; (2) workshop drawings; and (3) project parties changes delays. The knowledge of the system is acquired from literature, Federation International des Ingenieurs-Conseils (FIDIC) contract forms, domain experts, as well as a questionnaire survey. Three classes of participants (consultants, contractors, and employers) have been approached to get their feedback on the cases of engineering-related delays. The design of the questionnaire and criteria for selecting participants are described. The feedback of the participants is analyzed to draw the main causes of engineering-related delays. The proposed system’s built-in rules utilize the procedure of FIDIC contract forms for both design-bid-build and design-build projects. In addition, it provides flexibility in utilizing other customized procedures. The system advises on the claim entitlement, responsibility, and compensability of claims. A case study is presented to demonstrate the capabilities of the proposed expert system.
    publisherAmerican Society of Civil Engineers
    titleAssessing Construction Engineering-Related Delays: Egyptian Perspective
    typeJournal Paper
    journal volume134
    journal issue3
    journal titleJournal of Professional Issues in Engineering Education and Practice
    identifier doi10.1061/(ASCE)1052-3928(2008)134:3(315)
    treeJournal of Professional Issues in Engineering Education and Practice:;2008:;Volume ( 134 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian