YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Professional Issues in Engineering Education and Practice
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Professional Issues in Engineering Education and Practice
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Avoiding Change Orders in Public School Construction

    Source: Journal of Professional Issues in Engineering Education and Practice:;2007:;Volume ( 133 ):;issue: 001
    Author:
    Suat Günhan
    ,
    David Arditi
    ,
    Jacqueline Doyle
    DOI: 10.1061/(ASCE)1052-3928(2007)133:1(67)
    Publisher: American Society of Civil Engineers
    Abstract: Increased student enrollment and the current poor state of the educational infrastructure require the construction of more school buildings and the renovation of many of the existing ones. The large number and magnitude of change orders in these projects constitute an impediment to the rapid and economic delivery of these projects. A total of 6,585 change orders filed in a school district’s projects in the 5 1/2 year period from 1999 to 2004 were analyzed in five categories including owner-directed changes, code compliance issues, errors/omissions in contract documents, discovered or changed conditions, and others. The results of the study indicate that the dollar value of change orders relative to the original contract can be reduced if preventive measures are taken. These measures include choosing the right construction management firm, emphasizing the definition of project scope early in the project, and effectively managing the precontract activities by conducting value engineering and constructability reviews. The results indicate that school projects can be completed with change orders not exceeding 5% of the contract value if these measures are taken. This study is of relevance to practitioners involved in school design and construction projects.
    • Download: (126.4Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Avoiding Change Orders in Public School Construction

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/47840
    Collections
    • Journal of Professional Issues in Engineering Education and Practice

    Show full item record

    contributor authorSuat Günhan
    contributor authorDavid Arditi
    contributor authorJacqueline Doyle
    date accessioned2017-05-08T21:20:46Z
    date available2017-05-08T21:20:46Z
    date copyrightJanuary 2007
    date issued2007
    identifier other%28asce%291052-3928%282007%29133%3A1%2867%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/47840
    description abstractIncreased student enrollment and the current poor state of the educational infrastructure require the construction of more school buildings and the renovation of many of the existing ones. The large number and magnitude of change orders in these projects constitute an impediment to the rapid and economic delivery of these projects. A total of 6,585 change orders filed in a school district’s projects in the 5 1/2 year period from 1999 to 2004 were analyzed in five categories including owner-directed changes, code compliance issues, errors/omissions in contract documents, discovered or changed conditions, and others. The results of the study indicate that the dollar value of change orders relative to the original contract can be reduced if preventive measures are taken. These measures include choosing the right construction management firm, emphasizing the definition of project scope early in the project, and effectively managing the precontract activities by conducting value engineering and constructability reviews. The results indicate that school projects can be completed with change orders not exceeding 5% of the contract value if these measures are taken. This study is of relevance to practitioners involved in school design and construction projects.
    publisherAmerican Society of Civil Engineers
    titleAvoiding Change Orders in Public School Construction
    typeJournal Paper
    journal volume133
    journal issue1
    journal titleJournal of Professional Issues in Engineering Education and Practice
    identifier doi10.1061/(ASCE)1052-3928(2007)133:1(67)
    treeJournal of Professional Issues in Engineering Education and Practice:;2007:;Volume ( 133 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian