YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Professional Issues in Engineering Education and Practice
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Professional Issues in Engineering Education and Practice
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Quantification of Costs for Dispute Resolution Procedures in the Construction Industry

    Source: Journal of Professional Issues in Engineering Education and Practice:;2006:;Volume ( 132 ):;issue: 003
    Author:
    Richard J. Gebken II
    ,
    G. Edward Gibson
    DOI: 10.1061/(ASCE)1052-3928(2006)132:3(264)
    Publisher: American Society of Civil Engineers
    Abstract: The extent to which disputes affect the construction industry has been well-documented. There are a plethora of anecdotal stories, and even some data that explain how unresolved conflict can impact project cost, schedule, and quality. In response, many systems and procedures have been developed to address disputes and their resolution within the construction industry. However, no data exist that quantitatively compare these various alternatives and the real costs of resolving a dispute using methods other than litigation. This paper presents a framework for identifying and capturing the transactional costs incurred to resolve disputes throughout the full spectrum of resolution options. Transactional cost data from 46 recently completed construction projects, totaling over $2 billion of total installed costs, confirm that these sums can account for a large portion of the settlement/award amount, the original claim amount, and even the total contract value when using some dispute resolution methods. Furthermore, using dispute trend and cost data, a comprehensive dispute management system based upon the concepts of risk management is proposed, highlighting the overriding objective of promoting dispute avoidance/resolution in the most cost-efficient manner possible.
    • Download: (427.5Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Quantification of Costs for Dispute Resolution Procedures in the Construction Industry

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/47821
    Collections
    • Journal of Professional Issues in Engineering Education and Practice

    Show full item record

    contributor authorRichard J. Gebken II
    contributor authorG. Edward Gibson
    date accessioned2017-05-08T21:20:42Z
    date available2017-05-08T21:20:42Z
    date copyrightJuly 2006
    date issued2006
    identifier other%28asce%291052-3928%282006%29132%3A3%28264%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/47821
    description abstractThe extent to which disputes affect the construction industry has been well-documented. There are a plethora of anecdotal stories, and even some data that explain how unresolved conflict can impact project cost, schedule, and quality. In response, many systems and procedures have been developed to address disputes and their resolution within the construction industry. However, no data exist that quantitatively compare these various alternatives and the real costs of resolving a dispute using methods other than litigation. This paper presents a framework for identifying and capturing the transactional costs incurred to resolve disputes throughout the full spectrum of resolution options. Transactional cost data from 46 recently completed construction projects, totaling over $2 billion of total installed costs, confirm that these sums can account for a large portion of the settlement/award amount, the original claim amount, and even the total contract value when using some dispute resolution methods. Furthermore, using dispute trend and cost data, a comprehensive dispute management system based upon the concepts of risk management is proposed, highlighting the overriding objective of promoting dispute avoidance/resolution in the most cost-efficient manner possible.
    publisherAmerican Society of Civil Engineers
    titleQuantification of Costs for Dispute Resolution Procedures in the Construction Industry
    typeJournal Paper
    journal volume132
    journal issue3
    journal titleJournal of Professional Issues in Engineering Education and Practice
    identifier doi10.1061/(ASCE)1052-3928(2006)132:3(264)
    treeJournal of Professional Issues in Engineering Education and Practice:;2006:;Volume ( 132 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian