YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Professional Issues in Engineering Education and Practice
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Professional Issues in Engineering Education and Practice
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Developing and Implementing C‐SCSC

    Source: Journal of Professional Issues in Engineering Education and Practice:;1991:;Volume ( 117 ):;issue: 003
    Author:
    Amarjit Singh
    DOI: 10.1061/(ASCE)1052-3928(1991)117:3(295)
    Publisher: American Society of Civil Engineers
    Abstract: This paper looks at the essentials beyond mere knowledge of C‐SCSC formulas, to the successful implementation of C‐SCSC (cost‐schedule control systems criteria). The paper dwells on the management issues prevalent, and the managerial requisites for the implementation of C‐SCSC. To be able to successfully use the variance and index analyses of C‐SCSC, an immense, concerted project effort is needed. Although the arithmetical formulas used in C‐SCSC and forecasting are few and easy to understand, the management principles involved are deeper, demanding modified management attitudes. Systems planning and systems integration are emphasized as potent tools for the successful development, implementation, and use of C‐SCSC. Properly organizing, directing, and controlling C‐SCSC system development are dwelt upon in detail. Various human‐management concerns and state‐of‐the‐art drawbacks in construction management philosophy are highlighted. People problems during the implementation process frequently center around professional caliber, professional ethics, and professional and not‐so‐professional interests. Negative forces are associated with both the agent of change and its recipient. The paper examines the U.S. departments of Defense and Energy's use of C‐SCSC during the last decade and a half. It gives construction companies the means to achieve successful, state‐of‐the‐art construction management practices in the area of cost control.
    • Download: (918.8Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Developing and Implementing C‐SCSC

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/47073
    Collections
    • Journal of Professional Issues in Engineering Education and Practice

    Show full item record

    contributor authorAmarjit Singh
    date accessioned2017-05-08T21:19:27Z
    date available2017-05-08T21:19:27Z
    date copyrightJuly 1991
    date issued1991
    identifier other%28asce%291052-3928%281991%29117%3A3%28295%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/47073
    description abstractThis paper looks at the essentials beyond mere knowledge of C‐SCSC formulas, to the successful implementation of C‐SCSC (cost‐schedule control systems criteria). The paper dwells on the management issues prevalent, and the managerial requisites for the implementation of C‐SCSC. To be able to successfully use the variance and index analyses of C‐SCSC, an immense, concerted project effort is needed. Although the arithmetical formulas used in C‐SCSC and forecasting are few and easy to understand, the management principles involved are deeper, demanding modified management attitudes. Systems planning and systems integration are emphasized as potent tools for the successful development, implementation, and use of C‐SCSC. Properly organizing, directing, and controlling C‐SCSC system development are dwelt upon in detail. Various human‐management concerns and state‐of‐the‐art drawbacks in construction management philosophy are highlighted. People problems during the implementation process frequently center around professional caliber, professional ethics, and professional and not‐so‐professional interests. Negative forces are associated with both the agent of change and its recipient. The paper examines the U.S. departments of Defense and Energy's use of C‐SCSC during the last decade and a half. It gives construction companies the means to achieve successful, state‐of‐the‐art construction management practices in the area of cost control.
    publisherAmerican Society of Civil Engineers
    titleDeveloping and Implementing C‐SCSC
    typeJournal Paper
    journal volume117
    journal issue3
    journal titleJournal of Professional Issues in Engineering Education and Practice
    identifier doi10.1061/(ASCE)1052-3928(1991)117:3(295)
    treeJournal of Professional Issues in Engineering Education and Practice:;1991:;Volume ( 117 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian