YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Materials in Civil Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Materials in Civil Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Chloride-Induced Corrosion in Insufficiently Grouted Posttensioned Concrete Beams

    Source: Journal of Materials in Civil Engineering:;2008:;Volume ( 020 ):;issue: 001
    Author:
    Ha Minh
    ,
    Hiroshi Mutsuyoshi
    ,
    Hirotsugu Taniguchi
    ,
    Kyoji Niitani
    DOI: 10.1061/(ASCE)0899-1561(2008)20:1(85)
    Publisher: American Society of Civil Engineers
    Abstract: An experimental program was carried out to clarify the effect of chloride-induced corrosion on posttensioned concrete (PC) beams under different grout conditions using the electrically accelerated corrosion testing method. A series of accelerated corrosion tests were performed to evaluate the influence of insufficient grout condition on corrosion of sheath and prestressing tendon. The radial pressure surrounding the sheath during the corrosion process was also investigated. After a period of accelerated corrosion, the mechanical behavior of the deteriorated PC beams was clarified through loading tests. Prestressing tendon corrosion and its correlation with beam load-carrying capacity was also investigated. The results of the experiments demonstrate a significant influence of corrosion of sheath and prestressing tendon on load-carrying capacity of PC beams. The width of the corrosion crack in PC beams increases with grout filling level inside the sheath. The presence of water inside the sheath leads to increased rates of corrosion of the sheath and prestressing tendon, resulting in an earlier deterioration in the load-carrying capacity of PC beams.
    • Download: (812.0Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Chloride-Induced Corrosion in Insufficiently Grouted Posttensioned Concrete Beams

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/46372
    Collections
    • Journal of Materials in Civil Engineering

    Show full item record

    contributor authorHa Minh
    contributor authorHiroshi Mutsuyoshi
    contributor authorHirotsugu Taniguchi
    contributor authorKyoji Niitani
    date accessioned2017-05-08T21:18:27Z
    date available2017-05-08T21:18:27Z
    date copyrightJanuary 2008
    date issued2008
    identifier other%28asce%290899-1561%282008%2920%3A1%2885%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/46372
    description abstractAn experimental program was carried out to clarify the effect of chloride-induced corrosion on posttensioned concrete (PC) beams under different grout conditions using the electrically accelerated corrosion testing method. A series of accelerated corrosion tests were performed to evaluate the influence of insufficient grout condition on corrosion of sheath and prestressing tendon. The radial pressure surrounding the sheath during the corrosion process was also investigated. After a period of accelerated corrosion, the mechanical behavior of the deteriorated PC beams was clarified through loading tests. Prestressing tendon corrosion and its correlation with beam load-carrying capacity was also investigated. The results of the experiments demonstrate a significant influence of corrosion of sheath and prestressing tendon on load-carrying capacity of PC beams. The width of the corrosion crack in PC beams increases with grout filling level inside the sheath. The presence of water inside the sheath leads to increased rates of corrosion of the sheath and prestressing tendon, resulting in an earlier deterioration in the load-carrying capacity of PC beams.
    publisherAmerican Society of Civil Engineers
    titleChloride-Induced Corrosion in Insufficiently Grouted Posttensioned Concrete Beams
    typeJournal Paper
    journal volume20
    journal issue1
    journal titleJournal of Materials in Civil Engineering
    identifier doi10.1061/(ASCE)0899-1561(2008)20:1(85)
    treeJournal of Materials in Civil Engineering:;2008:;Volume ( 020 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian