YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Performance of Constructed Facilities
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Performance of Constructed Facilities
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Collapse of the Quebec Bridge, 1907

    Source: Journal of Performance of Constructed Facilities:;2006:;Volume ( 020 ):;issue: 001
    Author:
    Cynthia Pearson
    ,
    Norbert Delatte
    DOI: 10.1061/(ASCE)0887-3828(2006)20:1(84)
    Publisher: American Society of Civil Engineers
    Abstract: In the late 19th century, the transportation needs of Quebec led to proposals for bridging the St. Lawrence River. The Quebec Bridge was the longest cantilever structure attempted until that time. In its final design, the clear span was 548.6 m (1,800 ft) long. The bridge project was financially troubled from the beginning. This caused many setbacks in the design and construction. Construction finally began in October 1900. In August 1907, the bridge collapsed suddenly. Seventy five workers were killed in the accident, and there were only 11 survivors from the workers on the span. A distinguished panel was assembled to investigate the disaster. The panel’s report found that the main cause of the bridge’s failure was improper design of the latticing on the compression chords. The collapse was initiated by the buckling failure of Chord A9L, on the anchor arm near the pier, immediately followed by Chord A9R. Theodore Cooper had been the consulting engineer for the Quebec Bridge project, and most of the blame for the disaster fell on his shoulders. He mandated unusually high allowable stresses, and failed to require recalculation of the bridge dead load when the span was lengthened.
    • Download: (526.4Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Collapse of the Quebec Bridge, 1907

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/44426
    Collections
    • Journal of Performance of Constructed Facilities

    Show full item record

    contributor authorCynthia Pearson
    contributor authorNorbert Delatte
    date accessioned2017-05-08T21:15:12Z
    date available2017-05-08T21:15:12Z
    date copyrightFebruary 2006
    date issued2006
    identifier other%28asce%290887-3828%282006%2920%3A1%2884%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/44426
    description abstractIn the late 19th century, the transportation needs of Quebec led to proposals for bridging the St. Lawrence River. The Quebec Bridge was the longest cantilever structure attempted until that time. In its final design, the clear span was 548.6 m (1,800 ft) long. The bridge project was financially troubled from the beginning. This caused many setbacks in the design and construction. Construction finally began in October 1900. In August 1907, the bridge collapsed suddenly. Seventy five workers were killed in the accident, and there were only 11 survivors from the workers on the span. A distinguished panel was assembled to investigate the disaster. The panel’s report found that the main cause of the bridge’s failure was improper design of the latticing on the compression chords. The collapse was initiated by the buckling failure of Chord A9L, on the anchor arm near the pier, immediately followed by Chord A9R. Theodore Cooper had been the consulting engineer for the Quebec Bridge project, and most of the blame for the disaster fell on his shoulders. He mandated unusually high allowable stresses, and failed to require recalculation of the bridge dead load when the span was lengthened.
    publisherAmerican Society of Civil Engineers
    titleCollapse of the Quebec Bridge, 1907
    typeJournal Paper
    journal volume20
    journal issue1
    journal titleJournal of Performance of Constructed Facilities
    identifier doi10.1061/(ASCE)0887-3828(2006)20:1(84)
    treeJournal of Performance of Constructed Facilities:;2006:;Volume ( 020 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian