YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Performance of Constructed Facilities
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Performance of Constructed Facilities
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Detailed Forensic Investigation and Rehabilitation Recommendation on Interstate Highway-30

    Source: Journal of Performance of Constructed Facilities:;2005:;Volume ( 019 ):;issue: 002
    Author:
    Dar-Hao Chen
    ,
    Tom Scullion
    ,
    John Bilyeu
    ,
    Moon Won
    DOI: 10.1061/(ASCE)0887-3828(2005)19:2(155)
    Publisher: American Society of Civil Engineers
    Abstract: The main objective of this study is to identify the cause of the punchouts observed on Interstate Highway 30 (IH-30), and to identify possible rehabilitation alternatives. Several nondestructive tests, as well as coring and trenching, were conducted in both distressed and nondistressed areas. Middepth horizontal cracks were found during routine repair and by the trenching performed in this study. It is believed that due to temperature variation at an early stage, horizontal cracks developed at the middepth interface between the steel and concrete. The truck traffic caused the horizontal cracks to deteriorate further. Repetitive truck traffic and thermal loading forced the concrete to crack vertically from the middepth where there were horizontal cracks. The closely spaced transverse and longitudinal cracks, along with the delamination, caused punchouts. Although the problem is not imminent, an immediate seal plus a 75 mm heavy-duty stone matrix asphalt (SMA) overlay will probably provide the most cost-effective remedy for this section of IH-30. Existing distressed areas should be repaired before the rehabilitation. To slow the deterioration, the district should use a latex modified chip seal or asphalt rubber seal (AC15-5TR) followed by a 75 mm heavy duty SMA. This is to provide bonding between the concrete and SMA overlay. If the district chooses to do nothing at this time, it will become costly in 2–3 years if current environmental and traffic conditions hold. The cost to repair a severely deteriorated continuously reinforced concrete pavement (CRCP) would be several times more than the 75 mm heavy duty SMA overlay.
    • Download: (1.652Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Detailed Forensic Investigation and Rehabilitation Recommendation on Interstate Highway-30

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/44379
    Collections
    • Journal of Performance of Constructed Facilities

    Show full item record

    contributor authorDar-Hao Chen
    contributor authorTom Scullion
    contributor authorJohn Bilyeu
    contributor authorMoon Won
    date accessioned2017-05-08T21:15:07Z
    date available2017-05-08T21:15:07Z
    date copyrightMay 2005
    date issued2005
    identifier other%28asce%290887-3828%282005%2919%3A2%28155%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/44379
    description abstractThe main objective of this study is to identify the cause of the punchouts observed on Interstate Highway 30 (IH-30), and to identify possible rehabilitation alternatives. Several nondestructive tests, as well as coring and trenching, were conducted in both distressed and nondistressed areas. Middepth horizontal cracks were found during routine repair and by the trenching performed in this study. It is believed that due to temperature variation at an early stage, horizontal cracks developed at the middepth interface between the steel and concrete. The truck traffic caused the horizontal cracks to deteriorate further. Repetitive truck traffic and thermal loading forced the concrete to crack vertically from the middepth where there were horizontal cracks. The closely spaced transverse and longitudinal cracks, along with the delamination, caused punchouts. Although the problem is not imminent, an immediate seal plus a 75 mm heavy-duty stone matrix asphalt (SMA) overlay will probably provide the most cost-effective remedy for this section of IH-30. Existing distressed areas should be repaired before the rehabilitation. To slow the deterioration, the district should use a latex modified chip seal or asphalt rubber seal (AC15-5TR) followed by a 75 mm heavy duty SMA. This is to provide bonding between the concrete and SMA overlay. If the district chooses to do nothing at this time, it will become costly in 2–3 years if current environmental and traffic conditions hold. The cost to repair a severely deteriorated continuously reinforced concrete pavement (CRCP) would be several times more than the 75 mm heavy duty SMA overlay.
    publisherAmerican Society of Civil Engineers
    titleDetailed Forensic Investigation and Rehabilitation Recommendation on Interstate Highway-30
    typeJournal Paper
    journal volume19
    journal issue2
    journal titleJournal of Performance of Constructed Facilities
    identifier doi10.1061/(ASCE)0887-3828(2005)19:2(155)
    treeJournal of Performance of Constructed Facilities:;2005:;Volume ( 019 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian