YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Estimating Precipitation Impacts for Scheduling

    Source: Journal of Construction Engineering and Management:;1989:;Volume ( 115 ):;issue: 004
    Author:
    Gary R. Smith
    ,
    Donn E. Hancher
    DOI: 10.1061/(ASCE)0733-9364(1989)115:4(552)
    Publisher: American Society of Civil Engineers
    Abstract: Contract managers are expected to evaluate requests for contract extensions due to abnormal weather. However, they may not have a definition of normal weather impact for comparison. The implicit assumption in a contractor's time‐extension request is that normal weather disruptions are included in the original schedule. While subjective estimates can be prepared for weather impact, analytical approaches have been limited. The development of an analytical technique for evaluating impact will provide a basis for comparing planned and actual weather impact. A conceptual model for evaluating precipitation impact is presented. The method utilizes a Markov process for prediction of rainfall events, combined with an impact evaluation utilizing basic fuzzy‐set operations. The treatment of information for the impact analysis stresses the individual treatment of activities. An example of a calculation is provided to demonstrate the technique. The proposed method provides an opportunity to evaluate normal weather impact to schedules, for planning purposes. If the normal weather impact can be defined, the difficulties of evaluating time‐extension requests can be reduced.
    • Download: (712.0Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Estimating Precipitation Impacts for Scheduling

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/44286
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorGary R. Smith
    contributor authorDonn E. Hancher
    date accessioned2017-05-08T21:14:59Z
    date available2017-05-08T21:14:59Z
    date copyrightDecember 1989
    date issued1989
    identifier other%28asce%290733-9364%281989%29115%3A4%28552%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/44286
    description abstractContract managers are expected to evaluate requests for contract extensions due to abnormal weather. However, they may not have a definition of normal weather impact for comparison. The implicit assumption in a contractor's time‐extension request is that normal weather disruptions are included in the original schedule. While subjective estimates can be prepared for weather impact, analytical approaches have been limited. The development of an analytical technique for evaluating impact will provide a basis for comparing planned and actual weather impact. A conceptual model for evaluating precipitation impact is presented. The method utilizes a Markov process for prediction of rainfall events, combined with an impact evaluation utilizing basic fuzzy‐set operations. The treatment of information for the impact analysis stresses the individual treatment of activities. An example of a calculation is provided to demonstrate the technique. The proposed method provides an opportunity to evaluate normal weather impact to schedules, for planning purposes. If the normal weather impact can be defined, the difficulties of evaluating time‐extension requests can be reduced.
    publisherAmerican Society of Civil Engineers
    titleEstimating Precipitation Impacts for Scheduling
    typeJournal Paper
    journal volume115
    journal issue4
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(1989)115:4(552)
    treeJournal of Construction Engineering and Management:;1989:;Volume ( 115 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian