| contributor author | T. G. Townsend | |
| contributor author | W. L. Miller | |
| contributor author | J. F. K. Earle | |
| date accessioned | 2017-05-08T21:14:54Z | |
| date available | 2017-05-08T21:14:54Z | |
| date copyright | January 1995 | |
| date issued | 1995 | |
| identifier other | %28asce%290733-9372%281995%29121%3A6%28465%29.pdf | |
| identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/44209 | |
| description abstract | A leachate-recycle system (LRS) consisting of four infiltration ponds was operated and monitored over a 28-month period at an active lined landfill in Florida. Ponds were constructed by excavating into the landfilled waste and by compacting lifts of solid waste to form the pond walls. A total of 36,470 m | |
| publisher | American Society of Civil Engineers | |
| title | Leachate-Recycle Infiltration Ponds | |
| type | Journal Paper | |
| journal volume | 121 | |
| journal issue | 6 | |
| journal title | Journal of Environmental Engineering | |
| identifier doi | 10.1061/(ASCE)0733-9372(1995)121:6(465) | |
| tree | Journal of Environmental Engineering:;1995:;Volume ( 121 ):;issue: 006 | |
| contenttype | Fulltext | |