YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Performance of Constructed Facilities
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Performance of Constructed Facilities
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Prefabricated Vertical-Drain Test Section in Craney Island Dredged Material Management Area

    Source: Journal of Performance of Constructed Facilities:;1999:;Volume ( 013 ):;issue: 001
    Author:
    Timothy D. Stark
    ,
    Thomas A. Williamson
    ,
    Jack Fowler
    ,
    David Pezza
    ,
    Yvonne Gibbons
    DOI: 10.1061/(ASCE)0887-3828(1999)13:1(8)
    Publisher: American Society of Civil Engineers
    Abstract: A 183 m by 122 m prefabricated vertical-drain test section was completed in February, 1993, in the Craney Island Dredged Material Management Area. The test section was constructed to evaluate the effectiveness of prefabricated vertical drains in consolidating the dredged fill and underlying foundation clay, thus increasing the storage capacity of the facility. The feasibility of installing prefabricated vertical drains was questionable because vertical drains had never been installed in an active dredged material management area; a drain length of approximately 50 m was close to the longest vertical drain ever installed, and the installation equipment could exert a ground pressure of only 10.3 kPa to operate on the surface of the soft dredged material. Results show that the dredged fill and foundation clay underwent substantial consolidation settlement (1.8 to 2.7 m in 30 months) after drain installation. In summary, prefabricated vertical drains appear to be an economical technique for increasing the storage capacity of active and inactive dredged material management areas.
    • Download: (241.8Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Prefabricated Vertical-Drain Test Section in Craney Island Dredged Material Management Area

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/44181
    Collections
    • Journal of Performance of Constructed Facilities

    Show full item record

    contributor authorTimothy D. Stark
    contributor authorThomas A. Williamson
    contributor authorJack Fowler
    contributor authorDavid Pezza
    contributor authorYvonne Gibbons
    date accessioned2017-05-08T21:14:51Z
    date available2017-05-08T21:14:51Z
    date copyrightFebruary 1999
    date issued1999
    identifier other%28asce%290887-3828%281999%2913%3A1%288%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/44181
    description abstractA 183 m by 122 m prefabricated vertical-drain test section was completed in February, 1993, in the Craney Island Dredged Material Management Area. The test section was constructed to evaluate the effectiveness of prefabricated vertical drains in consolidating the dredged fill and underlying foundation clay, thus increasing the storage capacity of the facility. The feasibility of installing prefabricated vertical drains was questionable because vertical drains had never been installed in an active dredged material management area; a drain length of approximately 50 m was close to the longest vertical drain ever installed, and the installation equipment could exert a ground pressure of only 10.3 kPa to operate on the surface of the soft dredged material. Results show that the dredged fill and foundation clay underwent substantial consolidation settlement (1.8 to 2.7 m in 30 months) after drain installation. In summary, prefabricated vertical drains appear to be an economical technique for increasing the storage capacity of active and inactive dredged material management areas.
    publisherAmerican Society of Civil Engineers
    titlePrefabricated Vertical-Drain Test Section in Craney Island Dredged Material Management Area
    typeJournal Paper
    journal volume13
    journal issue1
    journal titleJournal of Performance of Constructed Facilities
    identifier doi10.1061/(ASCE)0887-3828(1999)13:1(8)
    treeJournal of Performance of Constructed Facilities:;1999:;Volume ( 013 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian