Post‐Construction Performance of 4.6‐km BreakwaterSource: Journal of Performance of Constructed Facilities:;1988:;Volume ( 002 ):;issue: 003Author:Osama Moselhi
DOI: 10.1061/(ASCE)0887-3828(1988)2:3(159)Publisher: American Society of Civil Engineers
Abstract: This paper presents the performance aspects of a 4.6‐km‐long breakwater constructed in 1979 but not accepted by the owner until 1983, when remedial works were completed and post‐construction liabilities were established. The breakwater is of rubble mound construction with quarry run fill protected by a rock armor layer that is further reinforced on the seaside by a layer of precast concrete stabits. The stabits are secured at the crest by a concrete buttress wall. Delayed acceptance of the facility was attributed mainly to the development of cracks in the concrete buttress wall and the damage and/or settlement of a number of the protecting concrete stabits. The cracks ranged from a hairline cracking along the entire length of the breakwater to an extensive, relatively deep and wide cracking pattern at a number of isolated locations. Several stabits were found to be broken, and a few isolated locations, the stabit skin appeared to have slumped in short lengths. This paper describes the field investigations conducted, the nature of the cracks depicted, and the remedial works performed. To draw some lessons from this experience, the paper also raises the question of post‐construction liability, particularly on an international level, and illustrates that through negotiations and team effort such problems can be resolved, bringing the contract to a final settlement.
|
Collections
Show full item record
| contributor author | Osama Moselhi | |
| date accessioned | 2017-05-08T21:14:16Z | |
| date available | 2017-05-08T21:14:16Z | |
| date copyright | August 1988 | |
| date issued | 1988 | |
| identifier other | %28asce%290887-3828%281988%292%3A3%28159%29.pdf | |
| identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/43860 | |
| description abstract | This paper presents the performance aspects of a 4.6‐km‐long breakwater constructed in 1979 but not accepted by the owner until 1983, when remedial works were completed and post‐construction liabilities were established. The breakwater is of rubble mound construction with quarry run fill protected by a rock armor layer that is further reinforced on the seaside by a layer of precast concrete stabits. The stabits are secured at the crest by a concrete buttress wall. Delayed acceptance of the facility was attributed mainly to the development of cracks in the concrete buttress wall and the damage and/or settlement of a number of the protecting concrete stabits. The cracks ranged from a hairline cracking along the entire length of the breakwater to an extensive, relatively deep and wide cracking pattern at a number of isolated locations. Several stabits were found to be broken, and a few isolated locations, the stabit skin appeared to have slumped in short lengths. This paper describes the field investigations conducted, the nature of the cracks depicted, and the remedial works performed. To draw some lessons from this experience, the paper also raises the question of post‐construction liability, particularly on an international level, and illustrates that through negotiations and team effort such problems can be resolved, bringing the contract to a final settlement. | |
| publisher | American Society of Civil Engineers | |
| title | Post‐Construction Performance of 4.6‐km Breakwater | |
| type | Journal Paper | |
| journal volume | 2 | |
| journal issue | 3 | |
| journal title | Journal of Performance of Constructed Facilities | |
| identifier doi | 10.1061/(ASCE)0887-3828(1988)2:3(159) | |
| tree | Journal of Performance of Constructed Facilities:;1988:;Volume ( 002 ):;issue: 003 | |
| contenttype | Fulltext |