Measurement of Work Progress: Quantitative TechniqueSource: Journal of Construction Engineering and Management:;1989:;Volume ( 115 ):;issue: 003Author:Neil N. Eldin
DOI: 10.1061/(ASCE)0733-9364(1989)115:3(462)Publisher: American Society of Civil Engineers
Abstract: In this paper a procedure is presented which provides a method to quantify work progress on construction projects. The procedure employs two management concepts, the work breakdown structure and the earned value. Although the theoretical basis for the proposed procedure is not new to the industry, it provides professional construction managers and project managers with a practical implementation of these concepts. The procedure is also an excellent computer application in construction management that requires only minimum programming skills. Examples of the input data file and output reports from an actual project are provided for numerical illustration.
|
Show full item record
contributor author | Neil N. Eldin | |
date accessioned | 2017-05-08T21:13:44Z | |
date available | 2017-05-08T21:13:44Z | |
date copyright | September 1989 | |
date issued | 1989 | |
identifier other | %28asce%290733-9364%281989%29115%3A3%28462%29.pdf | |
identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/43509 | |
description abstract | In this paper a procedure is presented which provides a method to quantify work progress on construction projects. The procedure employs two management concepts, the work breakdown structure and the earned value. Although the theoretical basis for the proposed procedure is not new to the industry, it provides professional construction managers and project managers with a practical implementation of these concepts. The procedure is also an excellent computer application in construction management that requires only minimum programming skills. Examples of the input data file and output reports from an actual project are provided for numerical illustration. | |
publisher | American Society of Civil Engineers | |
title | Measurement of Work Progress: Quantitative Technique | |
type | Journal Paper | |
journal volume | 115 | |
journal issue | 3 | |
journal title | Journal of Construction Engineering and Management | |
identifier doi | 10.1061/(ASCE)0733-9364(1989)115:3(462) | |
tree | Journal of Construction Engineering and Management:;1989:;Volume ( 115 ):;issue: 003 | |
contenttype | Fulltext |