YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Computing in Civil Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Computing in Civil Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Visualization of Construction Progress Monitoring with 4D Simulation Model Overlaid on Time-Lapsed Photographs

    Source: Journal of Computing in Civil Engineering:;2009:;Volume ( 023 ):;issue: 006
    Author:
    Mani Golparvar-Fard
    ,
    Feniosky Peña-Mora
    ,
    Carlos A. Arboleda
    ,
    SangHyun Lee
    DOI: 10.1061/(ASCE)0887-3801(2009)23:6(391)
    Publisher: American Society of Civil Engineers
    Abstract: The ability to effectively communicate progress information and represent as-built and as-planned progress discrepancies are identified as key components for successful project management that allow corrective decisions to be made in a timely manner. However, current formats of reporting (e.g., textual progress reports, progress curves, and photographs) may not properly and quickly communicate project progress. Current monitoring methods also require manual data collection and extensive data extraction from different construction documents, which distract managers from the important task of decision making. Therefore, to facilitate progress monitoring, this paper proposes visualization of performance metrics that aims to represent progress deviations through superimposition of four-dimensional (4D) as-planned model over time-lapsed photographs in single and comprehensive visual imagery. As a part of the developed system, registration of the 4D model with photographs, augmenting photographs, and occlusion removal for progress images are presented. While contextual information is preserved, the as-built photographs are enhanced and augmented with 4D as-planned model in which the performance metrics are visualized. The augmented photographs provide a consistent platform for representing as-planned, as-built, and progress discrepancies information and facilitate communication and reporting processes.
    • Download: (1.723Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Visualization of Construction Progress Monitoring with 4D Simulation Model Overlaid on Time-Lapsed Photographs

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/43441
    Collections
    • Journal of Computing in Civil Engineering

    Show full item record

    contributor authorMani Golparvar-Fard
    contributor authorFeniosky Peña-Mora
    contributor authorCarlos A. Arboleda
    contributor authorSangHyun Lee
    date accessioned2017-05-08T21:13:35Z
    date available2017-05-08T21:13:35Z
    date copyrightNovember 2009
    date issued2009
    identifier other%28asce%290887-3801%282009%2923%3A6%28391%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/43441
    description abstractThe ability to effectively communicate progress information and represent as-built and as-planned progress discrepancies are identified as key components for successful project management that allow corrective decisions to be made in a timely manner. However, current formats of reporting (e.g., textual progress reports, progress curves, and photographs) may not properly and quickly communicate project progress. Current monitoring methods also require manual data collection and extensive data extraction from different construction documents, which distract managers from the important task of decision making. Therefore, to facilitate progress monitoring, this paper proposes visualization of performance metrics that aims to represent progress deviations through superimposition of four-dimensional (4D) as-planned model over time-lapsed photographs in single and comprehensive visual imagery. As a part of the developed system, registration of the 4D model with photographs, augmenting photographs, and occlusion removal for progress images are presented. While contextual information is preserved, the as-built photographs are enhanced and augmented with 4D as-planned model in which the performance metrics are visualized. The augmented photographs provide a consistent platform for representing as-planned, as-built, and progress discrepancies information and facilitate communication and reporting processes.
    publisherAmerican Society of Civil Engineers
    titleVisualization of Construction Progress Monitoring with 4D Simulation Model Overlaid on Time-Lapsed Photographs
    typeJournal Paper
    journal volume23
    journal issue6
    journal titleJournal of Computing in Civil Engineering
    identifier doi10.1061/(ASCE)0887-3801(2009)23:6(391)
    treeJournal of Computing in Civil Engineering:;2009:;Volume ( 023 ):;issue: 006
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian