YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Computing in Civil Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Computing in Civil Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Formalization of Construction Sequencing Rationale and Classification Mechanism to Support Rapid Generation of Sequencing Alternatives

    Source: Journal of Computing in Civil Engineering:;2007:;Volume ( 021 ):;issue: 006
    Author:
    Bonsang Koo
    ,
    Martin Fischer
    ,
    John Kunz
    DOI: 10.1061/(ASCE)0887-3801(2007)21:6(423)
    Publisher: American Society of Civil Engineers
    Abstract: Resequencing construction activities is a critical task for project planners for effective project control. Resequencing activities require planners to determine the impact or “role” an activity has on successor activities. They also need to determine the status of activities, i.e., which activities may or may not be delayed. Distinguishing the role and status of activities in turn requires planners to understand the rationale for activity sequences. The current critical path method (CPM) framework, however, represents sequencing rationale using precedence relationships and distinguishes activities only with respect to their time-criticality. Thus, planners find it difficult to keep track of individual sequencing logic, and manually inferring the role and status of activities becomes practically prohibitive in complex project schedules. The research presented in this paper addressed this limitation of the CPM framework by formalizing a constraint ontology and classification mechanism. The ontology allows planners to describe their rationale for activity sequences in a consistent and intuitive way, whereas the classification mechanism leverages the ontology to automatically infer the role and status of activities. The ontology and mechanisms were implemented in a prototype tool. With this tool, users can quickly verify which activities to delay to expedite critical milestone or bottleneck activities, thus making it possible to quickly evaluate and generate sequencing alternatives in CPM-based schedules.
    • Download: (1.592Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Formalization of Construction Sequencing Rationale and Classification Mechanism to Support Rapid Generation of Sequencing Alternatives

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/43344
    Collections
    • Journal of Computing in Civil Engineering

    Show full item record

    contributor authorBonsang Koo
    contributor authorMartin Fischer
    contributor authorJohn Kunz
    date accessioned2017-05-08T21:13:22Z
    date available2017-05-08T21:13:22Z
    date copyrightNovember 2007
    date issued2007
    identifier other%28asce%290887-3801%282007%2921%3A6%28423%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/43344
    description abstractResequencing construction activities is a critical task for project planners for effective project control. Resequencing activities require planners to determine the impact or “role” an activity has on successor activities. They also need to determine the status of activities, i.e., which activities may or may not be delayed. Distinguishing the role and status of activities in turn requires planners to understand the rationale for activity sequences. The current critical path method (CPM) framework, however, represents sequencing rationale using precedence relationships and distinguishes activities only with respect to their time-criticality. Thus, planners find it difficult to keep track of individual sequencing logic, and manually inferring the role and status of activities becomes practically prohibitive in complex project schedules. The research presented in this paper addressed this limitation of the CPM framework by formalizing a constraint ontology and classification mechanism. The ontology allows planners to describe their rationale for activity sequences in a consistent and intuitive way, whereas the classification mechanism leverages the ontology to automatically infer the role and status of activities. The ontology and mechanisms were implemented in a prototype tool. With this tool, users can quickly verify which activities to delay to expedite critical milestone or bottleneck activities, thus making it possible to quickly evaluate and generate sequencing alternatives in CPM-based schedules.
    publisherAmerican Society of Civil Engineers
    titleFormalization of Construction Sequencing Rationale and Classification Mechanism to Support Rapid Generation of Sequencing Alternatives
    typeJournal Paper
    journal volume21
    journal issue6
    journal titleJournal of Computing in Civil Engineering
    identifier doi10.1061/(ASCE)0887-3801(2007)21:6(423)
    treeJournal of Computing in Civil Engineering:;2007:;Volume ( 021 ):;issue: 006
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian