YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Computing in Civil Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Computing in Civil Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    CB-Contract: Case-Based Reasoning Approach to Construction Contract Strategy Formulation

    Source: Journal of Computing in Civil Engineering:;2006:;Volume ( 020 ):;issue: 005
    Author:
    D. K. Chua
    ,
    P. K. Loh
    DOI: 10.1061/(ASCE)0887-3801(2006)20:5(339)
    Publisher: American Society of Civil Engineers
    Abstract: The formulation of an appropriate contract strategy is a fundamental yet critical aspect of contractual arrangement for a project. This paper presents a decision support system (DSS) prototype for contract strategy formulation using the case-based reasoning (CBR) approach. The prototype is called CB-Contract. An overview on the scope and formulation process of contract strategy is provided. Contract strategy is regarded as comprising four main substrategies: (1) work packaging; (2) functional grouping; (3) contract type; and (4) award method. The significance of CBR in contract strategy formulation is examined. The overall architecture of CB-Contract is discussed, with particular emphasis on its knowledge component. A case structure for case representation has been suggested taking into account the important factors that need to be considered while formulating a contract strategy, in particular project characteristics, client’s objectives, and client’s comparative advantages. Issues pertaining to case indexing and similarity calculation for efficient retrieval of similar cases are explored. An illustrative example to obtain similar cases for a given set of project information is presented. Case adaptation that considers the robustness of each substrategy, the compatibility of the substrategies, and the expected effectiveness of the contract strategy is also included in the illustrative example.
    • Download: (245.5Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      CB-Contract: Case-Based Reasoning Approach to Construction Contract Strategy Formulation

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/43284
    Collections
    • Journal of Computing in Civil Engineering

    Show full item record

    contributor authorD. K. Chua
    contributor authorP. K. Loh
    date accessioned2017-05-08T21:13:17Z
    date available2017-05-08T21:13:17Z
    date copyrightSeptember 2006
    date issued2006
    identifier other%28asce%290887-3801%282006%2920%3A5%28339%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/43284
    description abstractThe formulation of an appropriate contract strategy is a fundamental yet critical aspect of contractual arrangement for a project. This paper presents a decision support system (DSS) prototype for contract strategy formulation using the case-based reasoning (CBR) approach. The prototype is called CB-Contract. An overview on the scope and formulation process of contract strategy is provided. Contract strategy is regarded as comprising four main substrategies: (1) work packaging; (2) functional grouping; (3) contract type; and (4) award method. The significance of CBR in contract strategy formulation is examined. The overall architecture of CB-Contract is discussed, with particular emphasis on its knowledge component. A case structure for case representation has been suggested taking into account the important factors that need to be considered while formulating a contract strategy, in particular project characteristics, client’s objectives, and client’s comparative advantages. Issues pertaining to case indexing and similarity calculation for efficient retrieval of similar cases are explored. An illustrative example to obtain similar cases for a given set of project information is presented. Case adaptation that considers the robustness of each substrategy, the compatibility of the substrategies, and the expected effectiveness of the contract strategy is also included in the illustrative example.
    publisherAmerican Society of Civil Engineers
    titleCB-Contract: Case-Based Reasoning Approach to Construction Contract Strategy Formulation
    typeJournal Paper
    journal volume20
    journal issue5
    journal titleJournal of Computing in Civil Engineering
    identifier doi10.1061/(ASCE)0887-3801(2006)20:5(339)
    treeJournal of Computing in Civil Engineering:;2006:;Volume ( 020 ):;issue: 005
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian