YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Computing in Civil Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Computing in Civil Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Agent-Based Compensatory Negotiation Methodology to Facilitate Distributed Coordination of Project Schedule Changes

    Source: Journal of Computing in Civil Engineering:;2003:;Volume ( 017 ):;issue: 001
    Author:
    Keesoo Kim
    ,
    Boyd C. Paulson, Jr.
    DOI: 10.1061/(ASCE)0887-3801(2003)17:1(10)
    Publisher: American Society of Civil Engineers
    Abstract: Change is ubiquitous in construction project schedules and there are many interrelationships and interdependencies in project schedule changes. Therefore, a schedule change in the work of a subcontractor might affect schedules of other subcontractors, as well as the project deadline. The subcontractor should resolve schedule conflicts with other affected subcontractors. This implies that there is a need for a methodology for the distributed coordination of project schedule changes (DCPSC). This paper presents a novel agent-based compensatory negotiation methodology to facilitate the DCPSC wherein a project can be rescheduled dynamically through negotiations by all of the concerned subcontractors. The methodology consists of a compensatory negotiation strategy based on utility of timing, multilinked negotiation protocols, and message-handling mechanisms. A simple case example illustrates the methodology. The methodology makes new contributions in both theoretical and practical areas. In practice, this methodology will improve project network schedules, by lowering the sum of the cost of the subcontractors associated with their resource constraints. In theory, the methodology provides a distributed coordination methodology that can improve interaction and collaboration among agents and people.
    • Download: (430.2Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Agent-Based Compensatory Negotiation Methodology to Facilitate Distributed Coordination of Project Schedule Changes

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/43114
    Collections
    • Journal of Computing in Civil Engineering

    Show full item record

    contributor authorKeesoo Kim
    contributor authorBoyd C. Paulson, Jr.
    date accessioned2017-05-08T21:12:59Z
    date available2017-05-08T21:12:59Z
    date copyrightJanuary 2003
    date issued2003
    identifier other%28asce%290887-3801%282003%2917%3A1%2810%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/43114
    description abstractChange is ubiquitous in construction project schedules and there are many interrelationships and interdependencies in project schedule changes. Therefore, a schedule change in the work of a subcontractor might affect schedules of other subcontractors, as well as the project deadline. The subcontractor should resolve schedule conflicts with other affected subcontractors. This implies that there is a need for a methodology for the distributed coordination of project schedule changes (DCPSC). This paper presents a novel agent-based compensatory negotiation methodology to facilitate the DCPSC wherein a project can be rescheduled dynamically through negotiations by all of the concerned subcontractors. The methodology consists of a compensatory negotiation strategy based on utility of timing, multilinked negotiation protocols, and message-handling mechanisms. A simple case example illustrates the methodology. The methodology makes new contributions in both theoretical and practical areas. In practice, this methodology will improve project network schedules, by lowering the sum of the cost of the subcontractors associated with their resource constraints. In theory, the methodology provides a distributed coordination methodology that can improve interaction and collaboration among agents and people.
    publisherAmerican Society of Civil Engineers
    titleAgent-Based Compensatory Negotiation Methodology to Facilitate Distributed Coordination of Project Schedule Changes
    typeJournal Paper
    journal volume17
    journal issue1
    journal titleJournal of Computing in Civil Engineering
    identifier doi10.1061/(ASCE)0887-3801(2003)17:1(10)
    treeJournal of Computing in Civil Engineering:;2003:;Volume ( 017 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian