contributor author | W. T. Chan | |
contributor author | Hao Hu | |
date accessioned | 2017-05-08T21:12:58Z | |
date available | 2017-05-08T21:12:58Z | |
date copyright | July 2002 | |
date issued | 2002 | |
identifier other | %28asce%290887-3801%282002%2916%3A3%28165%29.pdf | |
identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/43097 | |
description abstract | There are two alternatives for production organization in precast factories—namely, the comprehensive method and the specialized method. Production scheduling under the specialized alternative has been found to be a difficult optimization problem if heterogeneous elements are involved. A flow shop sequencing model that incorporates actual constraints encountered in practice is proposed for this difficult case of precast production scheduling. The model is solved using a genetic algorithm (GA). The traditional minimize makespan and the more practical minimize tardiness penalty objective functions are optimized separately, as well as simultaneously using a normalized weighted GA. Comparisons between the GA and classical heuristic rules show that the GA can obtain good schedules for the model, giving a family of solutions that are at least as good as those produced by the use of heuristic rules. | |
publisher | American Society of Civil Engineers | |
title | Production Scheduling for Precast Plants using a Flow Shop Sequencing Model | |
type | Journal Paper | |
journal volume | 16 | |
journal issue | 3 | |
journal title | Journal of Computing in Civil Engineering | |
identifier doi | 10.1061/(ASCE)0887-3801(2002)16:3(165) | |
tree | Journal of Computing in Civil Engineering:;2002:;Volume ( 016 ):;issue: 003 | |
contenttype | Fulltext | |