YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Off-Ramp Applications in Open-Book GMP Negotiations: Three Case Studies

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2025:;Volume ( 017 ):;issue: 003::page 04525022-1
    Author:
    Douglas D. Gransberg
    ,
    Marko Pala
    ,
    Nils J. Gransberg
    DOI: 10.1061/JLADAH.LADR-1285
    Publisher: American Society of Civil Engineers
    Abstract: Negotiating a guaranteed maximum price (GMP) can become a complex process, whose success depends on the owner determining that the contractor’s proposed GMP is fair and reasonable. State departments of transportation have sought to increase the probability of reaching a mutually agreed GMP for construction manager/general contractor (CMGC) and progressive design-build (PDB) projects by requiring open-book negotiations and a third party independent cost estimator (ICE). Most CMGC and PDB project contracts will include an off-ramp whereby the contract is terminated if a mutually agreed GMP is unable to be reached. This paper reviews three projects where the contractors’ estimates exceeded the owner’s available project budget and an off-ramp was implemented. The paper’s contribution is the finding that the inclusion of the ICE is critical to the owner’s understanding of the reasonability of the contractor’s proposed GMP. It also finds that the collaborative environment engendered by the open-book process facilitates the search for solutions to avoid termination of the contract. Lastly, the information provided by the contractor and the ICE prior to the off-ramp improved the technical scope of work for the project’s eventual reprocurement. Including an off-ramp clause in a collaborative delivery contract like construction manager/general contractor (CMGC) and progressive design-build (PDB) actually encourages pricing transparency during open-book negotiations by allowing the owner an option to terminate the contract for convenience if the current market pricing exceeds the available budget. The CMGC contractor and the progressive design-builder have made significant commitments of resources and money that will be lost if the off-ramp is exercised. Thus, it is in the contractors’ best interest to demonstrate to the owner that their pricing reflects the true market condition and avoid an off-ramp situation. When the contractor’s proposed price is close to the independent cost estimate’s (ICE) opinion of probable cost, the owner is better able to justify seeking additional funding to keep the project moving to completion, avoiding a significant delay in the delivery of critical infrastructure.
    • Download: (182.0Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Off-Ramp Applications in Open-Book GMP Negotiations: Three Case Studies

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4307549
    Collections
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction

    Show full item record

    contributor authorDouglas D. Gransberg
    contributor authorMarko Pala
    contributor authorNils J. Gransberg
    date accessioned2025-08-17T22:51:12Z
    date available2025-08-17T22:51:12Z
    date copyright8/1/2025 12:00:00 AM
    date issued2025
    identifier otherJLADAH.LADR-1285.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4307549
    description abstractNegotiating a guaranteed maximum price (GMP) can become a complex process, whose success depends on the owner determining that the contractor’s proposed GMP is fair and reasonable. State departments of transportation have sought to increase the probability of reaching a mutually agreed GMP for construction manager/general contractor (CMGC) and progressive design-build (PDB) projects by requiring open-book negotiations and a third party independent cost estimator (ICE). Most CMGC and PDB project contracts will include an off-ramp whereby the contract is terminated if a mutually agreed GMP is unable to be reached. This paper reviews three projects where the contractors’ estimates exceeded the owner’s available project budget and an off-ramp was implemented. The paper’s contribution is the finding that the inclusion of the ICE is critical to the owner’s understanding of the reasonability of the contractor’s proposed GMP. It also finds that the collaborative environment engendered by the open-book process facilitates the search for solutions to avoid termination of the contract. Lastly, the information provided by the contractor and the ICE prior to the off-ramp improved the technical scope of work for the project’s eventual reprocurement. Including an off-ramp clause in a collaborative delivery contract like construction manager/general contractor (CMGC) and progressive design-build (PDB) actually encourages pricing transparency during open-book negotiations by allowing the owner an option to terminate the contract for convenience if the current market pricing exceeds the available budget. The CMGC contractor and the progressive design-builder have made significant commitments of resources and money that will be lost if the off-ramp is exercised. Thus, it is in the contractors’ best interest to demonstrate to the owner that their pricing reflects the true market condition and avoid an off-ramp situation. When the contractor’s proposed price is close to the independent cost estimate’s (ICE) opinion of probable cost, the owner is better able to justify seeking additional funding to keep the project moving to completion, avoiding a significant delay in the delivery of critical infrastructure.
    publisherAmerican Society of Civil Engineers
    titleOff-Ramp Applications in Open-Book GMP Negotiations: Three Case Studies
    typeJournal Article
    journal volume17
    journal issue3
    journal titleJournal of Legal Affairs and Dispute Resolution in Engineering and Construction
    identifier doi10.1061/JLADAH.LADR-1285
    journal fristpage04525022-1
    journal lastpage04525022-8
    page8
    treeJournal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2025:;Volume ( 017 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian